8
Step One
: Place the floor panel in the desired location on a level surface. The floor panel must be level before
continuing. If the surface is not level, you may need to shim the bottom panel to make level. The floor Infra-
tile is towards the front of the sauna.
Note:
Depending on your flooring, the sauna may be shifted a short
distance after assembly in the event you needed access to your electrical outlet. If your floor is not level, you
may hear creaking of the wood when stepping on floor.
Step Two
: Place the Back Panel in the slot of the Floor Panel shown below.