11
Tower System
SHELVING/TOWER ASSEMBLY
• Position the next panel (a thru-drilled panel for a continuous system), aligning the holes in the panel with
the dowels in the cleat. Thread one (1) HiLow screw from hole in outside of thru-drilled panel into center
hole of cleat.
(See FIG. 5a)
Push double-sided studs through holes in panel to align with previously-
installed screw-in studs.
(See FIG. 5b)
• Fasten the cleat to the closet’s wall with two appropriate wall screws.
(See ‘Working with Different
Wall Types’ section and FIG. 6)
HINT:
In the case of walls which are not square, do not fully tighten cleat screws until all system parts are in place!
• Line up two of the cam locks of the top fixed shelf over the screw-in/double-sided studs and press over the
cams to fasten. Tighten the joint by turning each of the cam locks a full 180˚ clockwise with a Phillips head
screwdriver.
(See FIG. 7)
• Next, fasten the bottom fixed shelf by angling the shelf upwards and pushing the back cams over the studs
in the back.
(See FIG. 7b)
Use a screwdriver to turn each cam lock a full 180˚ clockwise.
(See FIG. 7a and
FIG 7b)
Lower front of shelf and use a short-handled screwdriver to secure front cam locks.
(See FIG. 8)
NOTE:
Omit bottom shelf if appropriate to the design or for double-hang section.
2. Attach another cleat as shown in
FIG. 9
. (Note: Each successive cleat will only have one HiLow Screw
attached through each successive panel.)
• Attach another panel (thru-drilled or stop drilled) to the cleat. Secure cleat through second panel with one
(1) HiLow Screw.
(See FIG. 10)
3. Continue to build the tower system across the wall by repeating steps 6-10 to secure all parts of
the system.
4. Add middle shelf(ves), as detailed in step 7 to tighten the cams.
NOTE:
The location of the middle shelf may vary if you plan different door or drawer combinations in this tower, or for taller
towers, or for non-standard double-hang height sections. For best results, measure the height of the clothes to hang in the bottom
half of the double hang to ensure they will fit.
5. Level tower system, adding shims, if necessary, to one or more partitions.
6. Attach toekicks, if appropriate, by removing dowels from cleats and securing to front of panel with one (1)
HiLow Screw.
(See “Toe Kick Installation” instructions for further details on contiguous panel
toekick installation.)
7. Attach fast caps to any exposed screw heads.
8. After securing all parts and tightening cleat screws, install the remaining accessories (doors, drawers, shoe
fences, sliding racks, etc.).
Содержание MasterSuite
Страница 1: ...INSTALLER S Assembly Installation Reference Guide...
Страница 9: ...9 43 FIG 1 FIG 2 FIG 3 a b c d Stand Alone Tower SHELVING TOWER ASSEMBLY FIG 4 FIG 5 a b c d d FIG 6...
Страница 12: ...12 Tower System SHELVING TOWER ASSEMBLY 12 43 FIG 1 FIG 2 FIG 3 FIG 4...
Страница 13: ...13 FIG 5 FIG 6 FIG 7 a b b a Tower System SHELVING TOWER ASSEMBLY FIG 8 13 FIG 9 FIG 10...
Страница 26: ...26 Single Double Wide Hutch SHELVING TOWER ASSEMBLY FIG 4 Cleat Hi Low Screw FIG 5 FIG 2 FIG 3 FIG 1...
Страница 32: ...32 Hamper Door DOOR DRAWER ASSEMBLY FIG 1 FIG 3 FIG 2 FIG 4...
Страница 39: ...39 FIG 12 Molding ACCESSORY ASSEMBLY FIG 11 FIG 8 FIG 9 FIG 10 FIG 7 GROO VE...
Страница 50: ...50 FIG 4 FIG 9 Island ACCESSORY ASSEMBLY FIG 5 FIG 6 Top FIG 7 Bottom View FIG 8...