![CLIVET WSAR-MT-E Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/clivet/wsar-mt-e/wsar-mt-e_installation-use-and-maintenance-manual_2625598011.webp)
11
10
8
7
9
3 - POSITIONING
A
B
C
Anchor the unit to the ground with anchor bolts (
7
) so as to
ensure the stability to the wind.
Prepare for the water connections:
•
shut-off valves (
A
)
•
drain valves for vent by compressed air (
B
)
•
through holes with flanges at water tight (
C
)
To access inside the unit (
9
) remove in sequence :
1 - lower lateral panels
loosen screws, lower panel, extract
2 - upper lateral panels
lower panel, extract
3 - casing fixing screw
4 - casing
turn up the casing, extract
5 - lower panels
loosen screws, lower panel, extract
CASING ASSEMBLY
1
Insert into the groove (
10-1
)
2 Pull
down
(
11-2
)
3 Push
4
Fix the casing from inside with the screws.
11
3
1
2
3
4
Содержание WSAR-MT-E
Страница 36: ...36 5 ELECTRICAL CONNECTIONS OK NO Max 6 Horus...