Note
Climinox
published on 01/01/2011
(this document can be modified without notice)
!
Electrical power supply
The electrical installation must comply with the safety rules
in order to protect people and property.
The frame must absolutely be grounded.
The electrical switchboard, in addition to the disconnectors
and thermal protections, has to have a locking by key for the
installation, in order to secure the maintenance and upkeep
operations.
In the case of a ceiling air conditioner, it is necessary to have
stable scaffolding that provides the required safeties.
Environment
The location of the air conditioner must be conceived so as to ensure the distribution of
the air and proper operation of the equipment in general. However the safety of
maintenance and upkeep personnel must be preserved. The clearances will be sufficient.
Installation & assembly
The installation must be carried out in compliance with basic safety standards.
The Climinox modular design is an advantage for assembly.
The air conditioner, without the handling equipment, is delivered in the form of a Kit that
is ready to assemble. It can be assembled to the ceiling, without any handling equipment,
in a room that is difficult to access, cluttered with machines or manufacturing lines.
The hydraulic and electrical supplies can be defined on the right or on the left
of the machine at the time of assembly.
The various components of the air conditioner are delivered on a pallet. The ventilation module
is pre-assembled and forms a unit.
Assemble the air conditioner in the following order:
1 - Preparation on the floor
Case with mounting on the ceiling:
Assemble the splashback with the triangular plate and
the stand carrier crosspiece.
Fasten the ceiling jambs onto the plates of the machine.
Use ø8 washers and nuts
6
/ 14