Note
Climinox
published on 01/01/2011
(this document can be modified without notice)
The 3rd code provides info on the heating battery:
n
C
: The number of rows in the hot water battery.
p
EL
v: The electric heating power and the power supply voltage.
The 4th code provides info on the ventilation:
n
V
v: The total number of fans and the power supply voltage.
The 5th code provides info on the options (...) :
PR
av: gates on the front
PR
ar: gates on the rear.
PX
ar: panel on the front.
PX
ar: panel on the rear.
BH
: Humiliation nozzle.
RL
: Cleaning ramp.
SD
: Direct blowing with grill
SG
: Blowing by textile duct.
Suspension and weight
The structure of the building must be able to support:
- the air conditioner while operating
- the hydraulic connections
- the electrical connections.
The table hereinafter allows you to estimate this constraint.
The air conditioner must be attached with lock nuts.
This precaution is especially important when the machine is fasted to
a sandwich board, in this case it is impossible to lock the nuts. Ordinary
nuts risk becoming unscrewed with the vibrations caused by the
ventilation.
5
/ 14
Weight of the air condition in lb (excluding accessories)
Type
SF3
SF6
DF3
DF4.5
DF6
A
Weight of the base unit
105.82
167.55
169.76
216.05
240.30
B
+ weight per fan
19.84
26.46
33.07
19.84
26.46
C
+ weight per battery row
33.07
60.63
60.63
88.18
115.74
D
Weight when empty
= A +(n x B) + (n x C)
E
+ water weight per row
14.55
29.10
29.10
43.65
58.20
F
Weight during operation
= D +(n x E)