D/
Lower bridge.
⇒
E/
Bridge pins should enter pin hole on kettle
perfectly, If not return to step 1 and repeat
leveling steps.
⇒
F/
Raise bridge and swing to far right (for twin
mixers only).
⇒
G/
Repeat steps
D
and
E
(for twin mixers
only).
7
.
Once positioned and leveled, permanently
secure the kettle's flanged feet to the floor
using 5/16 inch stainless steel lag bolts and
floor anchors (supplied by the installer).
Secure each of the flanged feet with one bolt
in each hole.
8
.
Connect piping as described in the "PIPING
CONNECTION" section.
ELECTRICAL SERVICE
CONNECTIONS
Install in accordance with local codes and/or the
National Electric Code ANSI/NFPA No 70-1981 (USA)
or the Canadian Electric Code CSA Standard C22.1
(Canada). A separate fused disconnect switch must
be supplied and installed. The kettle must be
electrically grounded by the installer.
The electric supply must match the power
requirements specified on the kettle's rating plate.
The copper wiring must be adequate to carry the
required current at the rated voltage.
1.
Ensure main power is turned off before
connecting wires.
2.
Remove the screws at the rear of the center
console cover, and remove the cover. A wiring
diagram is affixed to the underside of the
console cover.
3.
Feed permanent copper wiring 18" through the
cut-out in the bottom of the console. Connect
wiring in junction box in the bottom of the
console.
4.
Turn main power back on.
5.
Check for correct rotation of electric motor
(access by removing top front cover on center
console). If rotation is incorrect, disconnect
main power and reverse any two of the three
live lines.
6.
Replace the console cover and secure it with
screws.