CE-425  

 

 

 

  

  

Содержание CE-400 Series

Страница 1: ...400 Series Label Shrinking Machine Operation Manual...

Страница 2: ...EWORD 2 II FUNCTION 2 III SPECIFICATION 3 IV STRUCTURE DIAGRAM 4 V CONTROL PANEL 8 VI OPERATIONAL PROCESS 9 VII REFERENCE OF SHRINK TEMPERATURE AND TIME 11 VIII CAUTION 12 IX COMMON MALFUNCTION 13 X M...

Страница 3: ...re a conveyor is already available The CE 435 is just the shrink tunnel machine mountable on the conveyor CE 455 and CE 415 is able to shrink label both on the whole bottle and in the middle of bottle...

Страница 4: ...ink tunnel mm 800 150 380 1000 150 380 1000 150 150 800 200 400 Conveyor motor AC90W 220V AC90W 220V DC50W 220V Conveyor speed 0 10m min 0 10m min 0 10m min Loading weight 15kg 15kg 15kg Conveyor 812...

Страница 5: ...CE 400 Series Label Shrinking Machines Page 4 IV STRUCTURE DIAGRAM 1 CE 435...

Страница 6: ...CE 400 Series Label Shrinking Machines Page 5 2 CE 455...

Страница 7: ...CE 400 Series Label Shrinking Machines Page 6 3 CE 415...

Страница 8: ...CE 400 Series Label Shrinking Machines Page 7 4 CE 425...

Страница 9: ...2 Fan Control the motor of fan 3 Conveyor Control the motor of conveyor 4 Heating Control the heating pipes 5 Temp meter Adjust temp of shrink tunnel 6 Speed Adjuster Adjust speed of conveyor 7 Upper...

Страница 10: ...In order to reduce loss of heat try to enable tunnel to be close to conveyor CE 415 The height of CE 415 is decided by height of bottle Loosen the nuts and adjust shrink tunnel to be about 5cm higher...

Страница 11: ...ustment knob of heat shrink tunnel all the way to the right to Maximize Once it reaches temperature adjust the knob according to practical shrink effect and packing requirement CE 415 only has one kno...

Страница 12: ...temperature or too low speed if the film is broken Adjust these three factor temperature conveyor speed and heating adjustment until shrink effect is satisfied 11 After finish packing turn off heatin...

Страница 13: ...o the earth connection It is easy to get electric shock for operator without earth connection 4 Do not set temp above 200 or damage heating pipes or shorten its life 5 The machine should be placed lev...

Страница 14: ...MMON MALFUNCTION Case Cause Method No heat in the tunnel No power Put on the power Heating switch broken Replace Heating pipe or circuitry broken Replace or repair AC contactor Solid booster or temp m...

Страница 15: ...fessional technician is required XI SPARE PARTS LIST NO ITEMS CE 435 CE 455 CE 415 CE 425 1 Inner hexagon spanner 4 mm 1 1 1 1 2 Inner hexagon spanner 6 mm 1 1 1 3 Inner hexagon spanner 10 mm 1 1 4 Sp...

Страница 16: ...CE 400 Series Label Shrinking Machines Page 15 XII CIRCUIT DIAGRAM CE 435 Label Shrink Packaging Machine CE 455 Label Shrink Packaging Machine...

Страница 17: ...CE 400 Series Label Shrinking Machines Page 16 CE 415 Label Shrink Packaging Machine CE 425 Label Shrink Packaging Machine...