Models 24-CGA-10, 24-CGP-10, 24-CEA-10, 24-CEP-10
Page 33 SteamCraft 10 Service Manual, Chapter 2
7. Repeat steps 2 through 6 no more than three times. If the burners do not
light after the third attempt, call a Cleveland Range authorized service
representative to adjust the burner controls.
8. Turn off electrical power to the Steam Craft 10, at both the panel ON/OFF switch
(Figure 2-16), and the main disconnect switch (Figure 2-8, Recommended
Electrical Layout).
Final Setup and Checkout
The Final Setup and Checkout procedures prepare a recently installed or repaired
SteamCraft 10 for operation. The procedures check proper electrical, gas, water,
and drain connections to the SteamCraft 10, and verify basic steamer operation.
Read through all pans of this procedure before starting.
CAUTION
Equipment damage and faulty operation will result if the
gas, water, or electrical supplies fall below requirements.
This may be caused by other equipment on the same
supply lines. During all tests, adjustments, and inspection
of the SteamCraft 10, turn on all equipment drawing on
the same utility supply lines.
Installation Checks
Proper operation of the SteamCraft 10 is dependent upon proper
installation.Performing the following checks after installation could avoid
unnecessary service calls.
1. Refer to the appropriate dimension drawing and verify that the specified
clearances are met
2. Verify that the unit is level front to back and side to side.
3. Check inside each cooking compartment for proper installation of the drain
screen, slide racks, and door gasket assembly. Be sure the drain is not blocked.
4. Clean the protective plastic film off the outside of the Steam Craft 10.
5. Refer to the Installation Check List on page 8, and verify that each task has been
completed in accordance with the referenced paragraphs. Pay particular attention
to:
• Voltage Requirements and Electrical Connections
• Water Quality and Pressure Requirements
• Free Air Drain Layout and Venting
• Gas Supply Pressure Requirements (if applicable)
• Exhaust Hood Venting (if applicable)
6. Refer to Figure 2-8, and Table 2-3, and verify installation of proper size fuses or
breakers.
7. Check that the water supply valves are open.