Models 24-CGA-10, and 24-CEA-10 SteamCraft 10 Service Manual, Chapter 6 Page 111
INITIAL TEST PROCEDURE - MODEL 24-CEA-10
Before starting this procedure, review the Introduction and perform
the General Preparations.
Upper and Lower Compartment Steam Generators
A separate steam generator supplies steam to each cooking
compartment The upper and lower generators operate simultaneously
during some functions, and separately during others. Examine the
upper and lower component groups simultaneously or separately
according to the instructions at the beginning of each phase of testing.
WARNING
Death, severe electrical shock or equipment
damage can result from touching any component
inside the unit when the main disconnect switch is
in the on position. Use extreme caution during
testing with an access cover removed.
Set Up The Initial Test Conditions.
1. Turn off the control panel ON/OFF power switch.
2. Turn off the Main Disconnect Switch.
3. Make sure water is supplied to the unit and is on.
4. Remove the right side and front access panels. The float
assemblies, relays and contactors should be clearly visible.
Cleveland Range, Inc.
Printed 3/93