Installation Instruction
5.7 T-Rail Installation
7a. Slide T-Rails into Pre-assembled rail
clamp on Tri-groove beams and use a
6mm Allen key (Hex) to fasten on another
side via Rail Clamp for T-Rail.
Recommended Torque:
M8:18Nm
Note: Rail clamps can work on both sides
with no pre-assembled rail clamp.
7b. Determine the necessary length of
T-Rail prior to installation, if T-Rail isn’t
long enough; join two rails via Rail splice
as shown before installing the T-Rail as
directed in step 7a.
Note:
Connecting Rails on Structure system
are not recommended.
Rail Clamp
Pre-assembled
Rail Clamp
7c. Racking System installation is complete.