Installation Guide_PV-ezRack_SolarTerraceII-A_AU_V2.0
1/10 Duerdin Street, Clayton VIC 3168 Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
12
page
of 21
Installation Instruction
Connect the brace to the post using the M12 bolt and nut supplied.
Recommended torque:
M12 : 50-55N·m
Tube of the
pre-assembled support
Horizontal rotation is 10 degree
Horizontal rotation is 10 degree
Post Brace
±20mm
Fig. 6
Fig. 7