Installation Instruction
③
Keep the Rectangular Tube flat, put the
Tube L2 and Tube L3 into the Corrugated T-Base
280, align with the hole position, then put on
bolts M16*150
、
bushings
、
flat washers
、
spring washers and lock manually.
④
Keep the Tube L1 flat, install the other hole
with Corrugated T-Base 200.
⑤
Laying down the support, rotate Tube L2
and Tube L3, align the hole of Tube L3 with the
hole of H Joint130, put on bolts M16*130.
The above steps are all locked manually.
Note: Install the Trapezoidal Shim in the middle
of the slot hole of the T-Base for subsequent
adjustment.
Installation Instruction
Bushing
①
②
L3
L2
③
④
⑤
Figure. 6
Keep all M16 bolt heads aligned.
The support is complete as shown in Figure 7
Figure. 7
Figure. 8
5.1.4
Insert the assembled support into embedded bolts .Align the embedded bolts with the holes on the T-Base, put
on the spring washer, flat washer and nut, manual locking as shown in Figure 8.