System Overview

 BA-SDII/200, Corrugated T-Base 200

 BA-SDII/280, Corrugated T-Base 280

 GU-SDII/22/1913, Gutter 22*1913 

 C-SDII/50/35, Corrugated Clamp

 RR-GU/SDII/22, Rubber ring for Gutter 22

4.2 2 Precautions during Stainless Steel Fastener Installation

Improper operation may lead to deadlock of Bolts and Nuts. 
The below steps should be applied to every stainless steel nut and bolt assembly to reduce this risk.

4.2.1 Reduce the friction coefficient:

① 

Ensure that the thread surface is clean (no dirt or contaminant) 

② 

Apply lubricant (grease or 40# engine oil) to fasteners prior tightening to avoid galling or seizing in 

the threads;

4.2.2 General installation instructions:

①  

Apply force to fasteners in the direction of thread; 

②  

Apply force uniformly, to maintain required torque; 

③  

Professional tools and tool belts are recommended, avoid using electric tools for final tightening; 

④  

Avoid working at high temperatures,

4.2.3 Safe Torques

System Overview

4.3 Installation Dimensions

All drawings and dimensions in this installation guide are for a generic reference. The PV-ezRack

® 

ezShade 2.0 is to be optimized to suit specific conditions for each project and documented in a 
construction drawing. As a result, major components of the PV-ezRack

®

 ezShade 2.0 may be provided 

in section sizes and lengths that vary from those shown in this guide. The installation process 
detailed in this instruction guide remains the same regardless of the component size. In case you 
need to do any on-site modifications or alteration of the system in a way that would be different from 
the construction drawing please provide marked up drawings/sketches for Clenergy’s review prior 
modification for comment and approval.

Note: Tighten the bolts after adjusting all components in place. Tightening and loosening bolts repeatedly will 
lead to deadlock of bolts.

Содержание PV-ezRack ezShade 2.0

Страница 1: ...PV ezRack ezShade 2 0 Installation Guide V1 0...

Страница 2: ...ate occupational health and safety regulations Please also pay attention to other relevant regulations in your local region Please check that you are using the latest version of the installation manua...

Страница 3: ...ng to the figure above applying PV module 1960x992x35mm tilt angle 5 degree The MAX height from the ground is 2572mm The specific installation steps are as follows Planning 3 1 Installation Tools 3 To...

Страница 4: ...Clamp R SDII 168 Rail 168 HJ SDII 158 240 H Joint 240 RR GU SDII 22 Rubber ring for Gutter 22 SP SDII R 168 Splice for Rail 168 BA SDII 200 Corrugated T Base 200 G SDII 150 4300 Girder 150 4300 BA SDI...

Страница 5: ...the threads 4 2 2 General installation instructions Apply force to fasteners in the direction of thread Apply force uniformly to maintain required torque Professional tools and tool belts are recomme...

Страница 6: ...1 Note The M20 bolts and matching nuts washers and spring washers are provided by installer As shown in Figure 3 place bolts M12 35 into H Joint 130 240 5 1 1 5 1 2 Figure 3 Figure 2 Installation Ins...

Страница 7: ...n bolts M16 150 bushings flat washers spring washers and lock manually Keep the Tube L1 flat install the other hole with Corrugated T Base 200 Laying down the support rotate Tube L2 and Tube L3 align...

Страница 8: ...nts if there is deviation The adjustment range of the slot hole of T Base as shown in Figure 10 Fasten all bolts after adjustment Recommended torque for M16 bolts is 100 105 N m M20 is 200 220 N m Fig...

Страница 9: ...shown in Figure 16 5 3 Rail 60 Installation Figure 15 Figure 16 5 3 2 According to engineering drawings repeat the above operations to install the other Water Guide Rail 60 as shown in Figure 17 Note...

Страница 10: ...hown in Figure 19 Figure 19 Installation Instruction Note Make sure each row of PV Module is without gap PV Modules are attached closely with the Rails and the ends of PV Module are aligned Then faste...

Страница 11: ...8 bolts is 12 15N m 5 5 3 Tilt the Gutter and place it between the bottom of the PV Module and the Water Guide Rail60 as shown in Figure 24 The order of the Gutter is the same as the PV Module from lo...

Страница 12: ...cho Yokohama 231 0023 Japan Tel 81 45 228 8226 Fax 81 45 228 8316 E mail sales clenergy co jp www clenergy jp Clenergy Philippines 145 Yakal St San Antonio village Makati City Philippines Tel 63 977 8...

Отзывы: