background image

成Installation Guide_PV-ezRack_ezShade 2.0_AU_V1.0

1/10 Duerdin Street, Clayton VIC 3168 Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au

01

page

 

of 19

Introduction

Clenergy PV-ezRack

®

 ezShade 2.0 is a 

ground mounting system for PV installation 
in residential or commercial regions, and 
which is designed to create new spaces 
for solar energy while also providing shade 
for parking. The use of patented aluminium 
base rails, the Z-module technology and the 
splicing eliminate on site cutting and enables 
particularly fast installation. 

Please review this manual thoroughly before 
installing ezShade 2.0. This manual provides 
the following contents: (1) Installation planning; 
(2) Installation instructions.

The PV-ezRack

®

 ezShade 2.0 parts, when 

installed in accordance with this guide, will be 
structurally adequate and meet the GB50009-
2012, JIS8955, EN 1990/1991/1993, ASCE7-
10, ISO 14713 standard. During installation, 
and especially when working on the 
ground, please comply with the appropriate 
occupational health and safety regulations. 
Please also pay attention to other relevant 
regulations in your local region. Please check 
that you are using the latest version of the 
installation manual by contacting Clenergy via 
email on www.clenergy. com.cn.or contacting 
your local distributor.

The installer is solely responsible for:

• Comply with all applicable local or national 
   building codes that may replace this manual;
• Ensure that ezRack and other products are 
   appropriate for the particular installation  and 
   installation environment;
• Using only ezRack parts and installer-supplied 
   parts as specified by ezRack (substitution of 
   parts may void the warranty and invalidate the 
   letter of certification);
• During construction, ensure that the foundation 
   anchor bolts have sufficient strength and shear 
   force;
• How to recycle: according to local regulations;
• How to disassemble: reverse installation 
   process;
• Ensure that there are no less than two 
   professionals working on the panel installation;
• Ensure the installation of the electrical 
  equipment is performed by a professional and 
  accredited electrician.

Introduction
Planning
Tools &Components
System Overview
Installation Instruction

01

02
03
05
08

List of Contents

1. Introduction

Содержание PV-ezRack ezShade 2.0

Страница 1: ...PV ezRack ezShade 2 0 Installation Guide V1 0...

Страница 2: ...ate occupational health and safety regulations Please also pay attention to other relevant regulations in your local region Please check that you are using the latest version of the installation manua...

Страница 3: ...ng to the figure above applying PV module 1960x992x35mm tilt angle 5 degree The MAX height from the ground is 2572mm The specific installation steps are as follows Planning 3 1 Installation Tools 3 To...

Страница 4: ...Clamp R SDII 168 Rail 168 HJ SDII 158 240 H Joint 240 RR GU SDII 22 Rubber ring for Gutter 22 SP SDII R 168 Splice for Rail 168 BA SDII 200 Corrugated T Base 200 G SDII 150 4300 Girder 150 4300 BA SDI...

Страница 5: ...the threads 4 2 2 General installation instructions Apply force to fasteners in the direction of thread Apply force uniformly to maintain required torque Professional tools and tool belts are recomme...

Страница 6: ...1 Note The M20 bolts and matching nuts washers and spring washers are provided by installer As shown in Figure 3 place bolts M12 35 into H Joint 130 240 5 1 1 5 1 2 Figure 3 Figure 2 Installation Ins...

Страница 7: ...n bolts M16 150 bushings flat washers spring washers and lock manually Keep the Tube L1 flat install the other hole with Corrugated T Base 200 Laying down the support rotate Tube L2 and Tube L3 align...

Страница 8: ...nts if there is deviation The adjustment range of the slot hole of T Base as shown in Figure 10 Fasten all bolts after adjustment Recommended torque for M16 bolts is 100 105 N m M20 is 200 220 N m Fig...

Страница 9: ...shown in Figure 16 5 3 Rail 60 Installation Figure 15 Figure 16 5 3 2 According to engineering drawings repeat the above operations to install the other Water Guide Rail 60 as shown in Figure 17 Note...

Страница 10: ...hown in Figure 19 Figure 19 Installation Instruction Note Make sure each row of PV Module is without gap PV Modules are attached closely with the Rails and the ends of PV Module are aligned Then faste...

Страница 11: ...8 bolts is 12 15N m 5 5 3 Tilt the Gutter and place it between the bottom of the PV Module and the Water Guide Rail60 as shown in Figure 24 The order of the Gutter is the same as the PV Module from lo...

Страница 12: ...cho Yokohama 231 0023 Japan Tel 81 45 228 8226 Fax 81 45 228 8316 E mail sales clenergy co jp www clenergy jp Clenergy Philippines 145 Yakal St San Antonio village Makati City Philippines Tel 63 977 8...

Отзывы:

Похожие инструкции для PV-ezRack ezShade 2.0