background image

 

 

  1 / 10

 

Clenergy China   

 

 

 

 

 

 

                  Tel86 592 311 0088 

999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone   

 

Fac86 592 599 5028 

Xiang'an District 361101, Xiamen, Fujian, China 

 

 

[email protected] 

 

1.   Introduction 

Clenergy  PV-ezRack®  Commercial  Tilt

™ is developed  for  PV installation  on 

flat roof. The unique fixing parts can be easily installed with simple tools in a 

short time.   

 

Please read the installation instructions carefully before installing the product. 

This manual provides instructions for installing solar panels of different sizes.   

 

Please  install  PV-ezRack®  Commercial  Tilt

™  according  to  this  installation 

guide. It meets the relating standards when working on the roof, please comply 

with  the  appropriate  local  safety  regulations,  and  pay  attention  to  other 

relevant  regulations in  your local region. The  latest  version  of  the installation 

manual is available on our website 

www.clenergy.com.cn

. 

 

The installer shall comply with the following requirements:   

 
•Complying with all applicable local or national building codes, including any 
that may supersede this manual; 
•Ensuring that PV-ezRack and other products are appropriate for the particular 
installation and the installation environment; 
•Using only PV-ezRack parts and installer-supplied parts as specified by the 
PV-ezRack project plan. (substitution of parts may void the warranty and 
invalidate the letter of certification); 
•Recycling: Recycle: according to the local relative statute. 
•Removal: Reverse installation process. 
•Ensure that there are no less than two professionals working on panel 
installation. 
•Ensure the installation of related electrical equipment is performed by 
licenced electricians. 
 
 

 

 

 

 

 

Содержание PV-ezRack Commercial Tilt

Страница 1: ...PV ezRack Commercial Tilt Installation Guide V1 0 Content 1 Introduction 1 2 Tools Components 2 3 System Overview 3 4 Installation Instructions 5...

Страница 2: ...ions and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The installer shall comply with...

Страница 3: ...energy com cn 2 Installation Tools and Components 2 1 Tools Power Drill max torque 20N m for M8 hexagon socket head bolts and M8 nuts String Torque Wrench 5m Tape Measure Marker Pen 2 2 Components FL...

Страница 4: ...Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 1 Reduce the friction coefficient 1 Ensure that the thread surface...

Страница 5: ...tly until each component is adjusted properly Repeated fastening or unlocking will result in bolt galling deadlock 3 3 Installation Dimensions All drawings and dimensions in this installation guide ar...

Страница 6: ...ten the bolts as shown in Fig 1 Note The distance between the front rear leg end and the ballast bar end shall accord with the dimension indicated on the project drawings Slide the front and rear leg...

Страница 7: ...tween the ballast and the front leg to avoid impeding the assembling due to excessively high ballast When wind deflectors are required be sure to keep enough space between the ballast and the rear leg...

Страница 8: ...s as shown in Fig 6 Recommended tightening torque for M8 bolt 16 20N m 4 1 6 Slide the inter clamp into the front and rear legs of the first PV module as shown in Fig 7 If grounding installation is re...

Страница 9: ...gainst the limiting edges of the inter clamp and the front leg Slide the end clamp into place check the position and then fasten the end clamp as shown in Fig 11 Recommended tightening torque for M8 b...

Страница 10: ...rotate it 90 degrees clockwise and make sure it s in place and tighten the nut as shown in Fig 14 Recommended tightening torque for M8 nut 13 14N m 4 1 12 Tighten the remaining bolts in the way as des...

Страница 11: ...Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn In case of irregular array the grounding lugs shall also be attached to the irregular parts of the arr...

Отзывы: