background image

 

 

  5 / 10

 

Clenergy China   

 

 

 

 

 

 

                  Tel86 592 311 0088 

999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone   

 

Fac86 592 599 5028 

Xiang'an District 361101, Xiamen, Fujian, China 

 

 

[email protected] 

 

4.   Installation Instructions 

4.1.1  According  to  the 

installation plan, fix the front 

leg  and  rear  leg  on  the 

ballast  bar,  check  the  size 

and  position,  and  then 

tighten  the  bolts,  as  shown 

in Fig. 1. 

 

 

Note: 

- The distance between the 

front/rear  leg  end  and  the 

ballast bar end shall accord 

with 

the 

dimension 

indicated  on  the  project 

drawings; 

- Slide the front and rear leg 

respectively 

in 

to 

the 

mounting 

slots 

on 

the 

ballast bar; 

- Put the ballast bar upright, 

so that it would be easier to 

fix the front and rear legs. 

 

Recommended 

tightening 

torque 

for 

M8 

bolt: 

16-20N·m 

 

4.1.2  According  to  the 

installation  plan,  mark  out 

the  installation position and 

place the front and rear legs 

accordingly,  as  shown  in 

Fig. 2. 

 

 

 

 

Fig. 1 

 

 

 

 

 

 

 

 

Fig. 2 

Содержание PV-ezRack Commercial Tilt

Страница 1: ...PV ezRack Commercial Tilt Installation Guide V1 0 Content 1 Introduction 1 2 Tools Components 2 3 System Overview 3 4 Installation Instructions 5...

Страница 2: ...ions and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The installer shall comply with...

Страница 3: ...energy com cn 2 Installation Tools and Components 2 1 Tools Power Drill max torque 20N m for M8 hexagon socket head bolts and M8 nuts String Torque Wrench 5m Tape Measure Marker Pen 2 2 Components FL...

Страница 4: ...Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 1 Reduce the friction coefficient 1 Ensure that the thread surface...

Страница 5: ...tly until each component is adjusted properly Repeated fastening or unlocking will result in bolt galling deadlock 3 3 Installation Dimensions All drawings and dimensions in this installation guide ar...

Страница 6: ...ten the bolts as shown in Fig 1 Note The distance between the front rear leg end and the ballast bar end shall accord with the dimension indicated on the project drawings Slide the front and rear leg...

Страница 7: ...tween the ballast and the front leg to avoid impeding the assembling due to excessively high ballast When wind deflectors are required be sure to keep enough space between the ballast and the rear leg...

Страница 8: ...s as shown in Fig 6 Recommended tightening torque for M8 bolt 16 20N m 4 1 6 Slide the inter clamp into the front and rear legs of the first PV module as shown in Fig 7 If grounding installation is re...

Страница 9: ...gainst the limiting edges of the inter clamp and the front leg Slide the end clamp into place check the position and then fasten the end clamp as shown in Fig 11 Recommended tightening torque for M8 b...

Страница 10: ...rotate it 90 degrees clockwise and make sure it s in place and tighten the nut as shown in Fig 14 Recommended tightening torque for M8 nut 13 14N m 4 1 12 Tighten the remaining bolts in the way as des...

Страница 11: ...Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn In case of irregular array the grounding lugs shall also be attached to the irregular parts of the arr...

Отзывы: