background image

 

 

  7 / 10

 

Clenergy China   

 

 

 

 

 

 

                  Tel86 592 311 0088 

999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone   

 

Fac86 592 599 5028 

Xiang'an District 361101, Xiamen, Fujian, China 

 

 

[email protected] 

 

4.1.5  Make  sure  the  PV 

module  is  placed  properly 

and  levelly,  and  then  slide 

the  end  clamps  into  the 

front 

and 

rear 

legs 

respectively  to  fix  the  PV 

module.  Fasten  the  end 

clamps as shown in Fig. 6. 

Recommended 

tightening 

torque 

for 

M8 

bolt: 

16-20N·m 

 

4.1.6  Slide  the  inter  clamp 

into  the  front  and  rear  legs 

of  the  first  PV  module,  as 

shown in Fig. 7.   

 

If  grounding  installation  is 

required, the grounding  clip 

shall  be  fixed  in  the  inter 

clamp, as shown in Fig. 8.   

 

4.1.7  Place  the  second  PV 

module  on  the  front  and 

rear  legs,  with  the  frame 

pressed against the limiting 

edges  of  the  inter  clamp 

and  the  front  leg,  and  then 

fasten  the  inter  clamp  as 

shown in Fig. 9 & 10. 

   

Recommended 

tightening 

torque 

for 

M8 

bolt: 

16-20N·m 

 

 

       

 

Fig. 6 

 

 

Fig. 7 

 

Fig. 8 

 

Fig. 9 

 

Fig. 10 

Содержание PV-ezRack Commercial Tilt

Страница 1: ...PV ezRack Commercial Tilt Installation Guide V1 0 Content 1 Introduction 1 2 Tools Components 2 3 System Overview 3 4 Installation Instructions 5...

Страница 2: ...ions and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The installer shall comply with...

Страница 3: ...energy com cn 2 Installation Tools and Components 2 1 Tools Power Drill max torque 20N m for M8 hexagon socket head bolts and M8 nuts String Torque Wrench 5m Tape Measure Marker Pen 2 2 Components FL...

Страница 4: ...Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 1 Reduce the friction coefficient 1 Ensure that the thread surface...

Страница 5: ...tly until each component is adjusted properly Repeated fastening or unlocking will result in bolt galling deadlock 3 3 Installation Dimensions All drawings and dimensions in this installation guide ar...

Страница 6: ...ten the bolts as shown in Fig 1 Note The distance between the front rear leg end and the ballast bar end shall accord with the dimension indicated on the project drawings Slide the front and rear leg...

Страница 7: ...tween the ballast and the front leg to avoid impeding the assembling due to excessively high ballast When wind deflectors are required be sure to keep enough space between the ballast and the rear leg...

Страница 8: ...s as shown in Fig 6 Recommended tightening torque for M8 bolt 16 20N m 4 1 6 Slide the inter clamp into the front and rear legs of the first PV module as shown in Fig 7 If grounding installation is re...

Страница 9: ...gainst the limiting edges of the inter clamp and the front leg Slide the end clamp into place check the position and then fasten the end clamp as shown in Fig 11 Recommended tightening torque for M8 b...

Страница 10: ...rotate it 90 degrees clockwise and make sure it s in place and tighten the nut as shown in Fig 14 Recommended tightening torque for M8 nut 13 14N m 4 1 12 Tighten the remaining bolts in the way as des...

Страница 11: ...Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn In case of irregular array the grounding lugs shall also be attached to the irregular parts of the arr...

Отзывы: