Limit Controls 

(see 

Figure 7

The operating and high pressure limit controls are
externally mounted to the boiler casing. For control
settings and testing instructions, see the boiler
operation manual.

1.7 Filling Boiler

Ensure that all feedwater equipment is properly installed and any feed
pumps, valves, etc. are in good working order.

Begin with the control panel DEMAND switch and the CC-BLOWER
switch (see 

Figure 8

) in the OFF position. Open the boiler vent valve

(see 

Figure 9

).

Turn the Control Circuit/Blower Switch ON to enable the feedwater
control circuit. If the CB Falcon icon does not appear on the display
when the CC/Blower switch is turned on, see 

STARTING THE

BOILER 

below.

With the vent valve open, entrapped air will be allowed to escape
while the boiler fills with water. Do not close the vent valve until water
is visible in the gauge glass. The feed pump will shut off when water reaches the ‘Pump Off’ probe level. 

Check to ensure that no leaks appear at any pipe connections and correct if water leaks are noticed.

!

Warning

T h e   M o d e l   C F H   i s   f a c t o r y   t e s t e d .
Nevertheless, all burner safety controls
should be checked upon installation, prior to
initial firing. 

Failure to verify burner control

functioning could result in severe bodily
injury or death.

For detailed procedures on how to test the 
safety controls, see the boiler Operation and 
Maintenance Manual.

The use of soft water is highly recommended. Failure to observe this recommendation can lead to dangerous operating conditions, 
and may result in damage to the boiler. If necessary, your Cleaver-Brooks representative can provide additional information 
regarding your water softening requirements.

Figure 9  Filling the Boiler

OLC

HLC

Figure 7  Limit Controls

Figure 8  Control Panel 

Switches

Important

!

Vent Valve

Gauge
Glass

Feedwater
Inlet

 

Содержание ClearFire SFH

Страница 1: ...www cleaverbrooks com ClearFire Model CFH Horizontal Steam Boiler Startup Guide 750 293...

Страница 2: ...essure testing of that system at test pressures in excess of 1 2 psi 3 5 kPa DANGER WARNING Should overheating occur or the gas supply valve fail to shut off do not turn off or disconnect the electric...

Страница 3: ...voltage ignition transformers Control panel must be connected to earth ground For electrical wiring requirements see wiring diagram provided with the boiler or in the CFH manual Figure 1 CFH Connecti...

Страница 4: ...re to be connected to the ClearFire boiler Refer to flue piping manufacturer for proper installation and sealing instructions See also Chapter 3 in the CFH Operation and Maintenance manual 1 4 Boiler...

Страница 5: ...in power 115 VAC single phase 60Hz and any remote wiring should be brought to the left side of the control panel and terminated at the appropriate terminals provided Controls for the boiler feed pump...

Страница 6: ...e Figure 5 include the following Combustion Air Proving Switch Low Gas Pressure Switch High Gas Pressure Switch Dual Safety Shut off Valve SSOV Depress all manual reset buttons for all controls prior...

Страница 7: ...not close the vent valve until water is visible in the gauge glass The feed pump will shut off when water reaches the Pump Off probe level Check to ensure that no leaks appear at any pipe connections...

Страница 8: ...pre configured with default parameter settings for the Model CFH Prior to starting the boiler verify that the factory default settings are correct for your application See the boiler operation manual...

Страница 9: ...igure 12 Operation screen 2 3 4 To change the steam pressure setpoint 1 Press the yellow highlighted setpoint display window 2 Clear the current value 3 Enter the desired value 4 Press OK 1 Note Some...

Страница 10: ...ble and attempt to start the burner The CB Falcon should lock out indicating Lockout 109 Ignition Failure Reconnect flame rod cable after test The CB Falcon requires a manual reset to resume operation...

Страница 11: ...manual for boil out procedure 5 LOCKOUTS HOLDS AND ALERTS To assist in monitoring boiler operation the CB Falcon control system employs messages of three types Lockouts Holds and Alerts Lockouts and...

Страница 12: ...Figure 15 Press this banner to access the Alert or Lockout History where a list of the most recently occurring Alerts Lockouts can be viewed To obtain more information for a particular message press t...

Страница 13: ...CFH Startup Guide Part No 750 293 13 Figure 16 CFH Wiring Diagram...

Отзывы: