background image

 

Table of Contents 

 

Packing list

 .................................................................................................................................... 2

 

Warning

 ........................................................................................................................................... 3

 

Section 1

 

Introduction

 ...................................................................................................... 7

 

1.1 Overview

 ........................................................................................................................................... 7

 

Section 2

 

Technical Specification

 ............................................................................... 8

 

Section 3

 

Installation Instructions

 .............................................................................. 9

 

Section 4

 

Operation Instructions

 ................................................................................. 9

 

4.1 Start the operation

 ............................................................................ 

Error! Bookmark not 

defined.

.................................................................................................................. 10

 

Section 5

 

Warranty

 ........................................................................................................... 11

 

 

 
 
 
 
 
 
 
 

 

 

Содержание TPS150V

Страница 1: ...1 TPS150V Power Supply Instruction manual www cleaverscientific com com info cleaverscientific com...

Страница 2: ...is liable for all missing or damaged parts accessories within 7 days after customer received this instrument package Please contact Cleaver Scientific immediately regarding this issue If no response w...

Страница 3: ...he user to read the following points carefully before operating this equipment 1 Read and follow the manual instructions carefully 2 Do not alter the equipment Failure to follow these directions could...

Страница 4: ...2000 meters 5 Ambient to 40 C operating temperature 6 Pollution degree 2 7 Mains supply voltage fluctuations up to 10 of the normal voltage Avoiding Electrical Shock Follow the guidelines below to ens...

Страница 5: ...age the equipment Equipment Operation Follow the guidelines below to ensure safe operation of the unit 1 NEVER access dangerous chemicals or other materials to prevent possible hazard of explosion and...

Страница 6: ...Warning 3 Section 1 Introduction 7 1 1 Overview 7 Section 2 Technical Specification 8 Section 3 Installation Instructions 9 Section 4 Operation Instructions 9 4 1 Start the operation Error Bookmark no...

Страница 7: ...leaver Scientific TPS150V Power Supply is uniquely equipped with specifications to address the majority of electrophoresis applications Output voltages can be selected between 75 150V giving reproduci...

Страница 8: ...ge Inc 75 or 150V Output Current Inc 0 300mA Output Type Constant Voltage Terminal Pairs 2 Pairs Operation Temperature Ambient to 40 Unit Dimension 100 x 191 x 100mm Construction material High Impact...

Страница 9: ...it is placed on a sturdy and level surface in a safe dry place and is connected to a suitably prepared electrophoresis system it is ready for operation Section 4 Operation Instructions 4 1 To operate...

Страница 10: ...the ON OFF switch Turn the screwdriver to gently pry open the fuse compartment Note The fuse compartment will not open with the power cord in place 3 Pull the fuse holder out of the compartment and in...

Страница 11: ...to purchaser This warranty excludes damages resulting from shipping misuse carelessness or neglect Cleaver Scientific s liability under the warranty is limited to the receipt of reasonable proof by t...

Страница 12: ...12...

Отзывы: