![ClearCube M2010S Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/clearcube/m2010s/m2010s_user-manual_2621132053.webp)
Chapter 5: Advanced Serverboard Setup
5-21
I
2
C to PCI-X/PCI-E Slots
Jumper Settings (JI
2
C1/JI
2
C2)
Jumper Setting Definition
JI
2
C1: Closed
JI
2
C2:Closed
Enabled
JI
2
C1: Open
JI
2
C2: Open
Disabled
I
2
C Bus to PCI-X/PCI-Exp. Slots
Jumpers JI
2
C1 and JI
2
C2 allow you to
connect the System Management Bus
(I
2
C) to the PCI-X/PCI-E slots. The
default setting is Open (Disabled.) Both
jumpers must be set to the same setting
See the table on the right for jumper
settings.
Compact Flash Master/Slave Select
A Compact Flash Master (Primary)/Slave
(Secondary) Select Jumper is located at
JCF1. Close this jumper to enable Com-
pact Flash Card. For the Compact Flash
Card or the Compact Flash Jumper
(JCF1) to work properly, you will need to
connect the Compact Flash Card power
cable to JWF1 first. Refer to the board
layout below for the location.
Compact Flash Card Master/
Slave Select (JCF1)
Jumper Definition
Open
Slave (Secondary)
Closed
Master (Primary)
Watch Dog Enable/Disable
JWD controls the Watch Dog function.
Watch Dog is a system monitor that
can reboot the system when a software
application hangs. Jumping pins 1-2
will cause WD to reset the system if an
application hangs. Jumping pins 2-3
will generate a non-maskable interrupt
signal for the application that hangs.
See the table on the right for jumper
settings. Watch Dog must also be en-
abled in BIOS.
Note:
When enabled, the user needs to
write their own application software in
order to disable the Watch Dog Timer.
Watch Dog
Jumper Settings (JWD)
Jumper Setting Definition
Pins 1-2
Reset
Pins 2-3
NMI
Open
Disabled
Содержание M2010S
Страница 1: ...www clearcube com M2010S Server and Chassis User s Guide ClearCube Technology Inc ...
Страница 8: ...Notes v iii T a b l e o f C o n t e n t s ...
Страница 19: ...Chapter 2 Server Installation 2 5 Figure 2 1 Installing Chassis Rails ...
Страница 21: ...Chapter 2 Server Installation 2 7 Figure 2 2 Installing the Server into a Rack ...
Страница 23: ...Chapter 2 Server Installation 2 9 Figure 2 3 Accessing the Inside of the System ...
Страница 28: ...ClearCube M2010S User s Guide 3 4 Notes ...
Страница 58: ...5 26 ClearCube M2010S User s Guide Notes ...
Страница 98: ...A 6 ClearCube M2010S User s Guide Notes ...
Страница 104: ...B 6 ClearCube M2010S User s Guide Notes ...
Страница 116: ...C 12 ClearCube M2010S User s Guide Notes ...
Страница 136: ...D 20 ClearCube M2010S User s Guide Notes ...
Страница 140: ...E 4 ClearCube M2010S User s Guide Notes ...
Страница 141: ......