Page 22 399G169 Rev B 27 April 2016
•
Consider both
capacity
and
coverage
. How many beltpack users are
there and what are their movements? Ensure that you have enough
capacity where users congregate, as well as allowing for coverage
area.
•
What are the individual characteristics of your site? Radio waves can
be reflected by metallic objects, and reduced by some objects,
including the human body (for instance, a large audience can affect
transmission).
•
What conduit (cabling) is already available on site? Are there power
points? Splitters must be powered locally, and Clear-Com
recommends powering antennas locally.
•
As a general rule, antennas should be placed 8 – 10 feet high (2.5 –
3 meters high).
•
When co-locating antennas for extra beltpack capacity in one area, do
not put the devices too close to each other. They should be placed
between 3 and 20 feet (1 - 7 meters) apart.
•
FS II antennas can be placed at any orientation.
•
Antennas have an IP (International Protection) rating of 65. This
means they can be mounted outside and will be weather-proof.
3.1.1
Antenna capacity (how many beltpacks?)
Clear-com recommends a conservative approach to antenna capacity, to
ensure coverage and allow for system losses.
•
1.9 GHz : 3 - 4 beltpacks per antenna
•
2.4 GHz: 2 - 3 beltpacks per antenna.
Содержание FreeSpeak II
Страница 18: ...Page 18 399G169 Rev B 27 April 2016 From the Base Station Disable DHCP Enter static IP address ...
Страница 31: ...Page 31 399G169 Rev B 27 April 2016 How to set cable length in the CCM 1 ...
Страница 32: ...Page 32 399G169 Rev B 27 April 2016 How to set cable length from the Base menus ...
Страница 65: ...Page 65 399G169 Rev B 27 April 2016 ...
Страница 70: ...Page 70 399G169 Rev B 27 April 2016 Save settings from the CCM ...
Страница 72: ...Page 72 399G169 Rev B 27 April 2016 Fix a Role in the CCM ...
Страница 73: ...Page 73 399G169 Rev B 27 April 2016 Fix a Role from the Base menu screens ...
Страница 80: ...Page 80 399G169 Rev B 27 April 2016 ...
Страница 85: ...Page 85 399G169 Rev B 27 April 2016 How to program a Talk key to the Group ...
Страница 89: ...Page 89 399G169 Rev B 27 April 2016 ...
Страница 90: ...Page 90 399G169 Rev B 27 April 2016 Edit Beltpack Roles from the Base Station ...
Страница 92: ...Page 92 399G169 Rev B 27 April 2016 Change Base Station key assignment from the Base Station ...
Страница 97: ...Page 97 399G169 Rev B 27 April 2016 ...