9
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
UNPACKING
The drill press is delivered with the components shown on page 8.
Check the parts against the list. Should there be any deficiencies or damage,
you should contact your CLARKE dealer immediately where the product was
originally purchased. Do not discard the packaging until the machine is
assembled. The packaging consists of cardboard and appropriately marked
materials which can be sent to a re-cycling facility.
To protect the machine parts from moisture, a protective coating of light
machine oil will have been applied to the outside surfaces. Remove any
excess with a paper towel.
Take care when lifting the head assembly, considering its weight.
ASSEMBLY
Before use, the machine must be mounted and securely bolted to a strong,
heavy workbench, of sufficient height that you will be standing upright when
working.
Ensure the work place is adequately lit, and that you will not be working in your
own shadow.
COLUMN TO BASE
1. Bolt the column to the base with the four bolts and washers provided.
NOTE:
Ideally, the base with column attached, should be firmly bolted to
the workbench, prior to the assembly of other components.
TABLE TO COLUMN
1. Push the crank onto the worm
drive spigot protruding from the
gear housing. Tighten the crank
set screw onto the flat side of the
spigot using a hex key supplied.