Clark-Reliance Jerguson 360 Series Скачать руководство пользователя страница 9

 

 

IOM J500.36 

Jerguson

®

 360 Series 

 

2017.10 

 

 

16633 Foltz Parkway ● Strongsville, OH  44149 USA ● 

Telephone: +1 (440) 572-1500 

 Fax: +1 (440) 238-8828 

www.Jerguson

.com ● sales@clark

-reliance.com

 

 

8.  Gently tap the stem into the valve body and pull out through the process port. The valve is now fully 

disassembled. 

 

 

 

 

 

 

 

 
 
Reassembly (Replacing the stem packing Part# G294 – Set of 3) 
 

1.  Replace thrust washer on stem flange.  Align side with chamfer on ID with face of stem flange. Angle 

the stem and insert into valve body. 
 
 
 
 
 
 
 
 
 
 

 

 

2.  Holding stem flange and washer pressed up against top of body, install -3- new packing rings into 

stuffing box.  Insert first ring and hand press in as deep as possible.  Align second ring with slit 180 
degrees from first ring and hand press in as deep as possible.  Align third ring with slit 90 degrees 
from second ring and hand press in as deep as possible.  Third ring should be about flush with top of 
valve face. 

 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 

 

Stem 

Stem Thrust Washer 

Содержание Jerguson 360 Series

Страница 1: ...ay Strongsville OH 44149 USA Telephone 1 440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com Installation Operation Maintenance Instructions IOM J500 36 2017 10 360 Series Safety...

Страница 2: ...440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com Table of Contents 1 INTRODUCTION 3 2 WARRANTY 3 3 ABOUT THIS MANUAL 3 4 INSPECTION AND DELIVERY 3 5 PRODUCT DESCRIPTION 3 6 S...

Страница 3: ...all instructions before attempting to install operate or maintain this equipment Only persons certified to perform work described herein should attempt any actions suggested Safety precautions and com...

Страница 4: ...IOM J500 36 Jerguson 360 Series 2017 10 4 16633 Foltz Parkway Strongsville OH 44149 USA Telephone 1 440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com 6 Specifications...

Страница 5: ...ess connection the valve is in the Bypass Position The Bypass Position is intended for use while the gage is being commissioned when there is already liquid present in the vessel This mode of operatio...

Страница 6: ...to open the top valve first This allows the pressure of the vessel to equalize with the gage 3 Open the bottom valve to the bypass position This will allow liquid to flow from the vessel through the...

Страница 7: ...orn nut lock washer and spacer Secure valve into a vice with the large compression nut facing upward Take care not to damage any of the external components Remove anti rotation pin and discard Use lar...

Страница 8: ...he ball mechanism by sliding it off of the stem through the process opening 5 If you wish to replace or remove the internal ballcheck remove the ball retainer clip If not continue to step 6 6 Remove u...

Страница 9: ...hrust washer on stem flange Align side with chamfer on ID with face of stem flange Angle the stem and insert into valve body 2 Holding stem flange and washer pressed up against top of body install 3 n...

Страница 10: ...Torque nuts in X pattern to 15 20 in lb Visually confirm gland follower is level 4 Install Handle Back onto valve and cycle the stem several times Leave valve handle in the closed position 5 Replace...

Страница 11: ...ke shown Place the new upstream seat and seal into the inlet gland opening 8 Insert the inlet gland assembly from the previous step into the valve as shown 9 Secure valve into a vice with the large co...

Страница 12: ...IOM J500 36 Jerguson 360 Series 2017 10 12 16633 Foltz Parkway Strongsville OH 44149 USA Telephone 1 440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com...

Отзывы: