Clark-Reliance Jerguson 360 Series Скачать руководство пользователя страница 3

 

 

IOM J500.36 

Jerguson

®

 360 Series 

 

2017.10 

 

 

16633 Foltz Parkway ● Strongsville, OH  44149 USA ● 

Telephone: +1 (440) 572-1500 

 Fax: +1 (440) 238-8828 

www.Jerguson

.com ● sales@clark

-reliance.com

 

 

1.Introduction 

Clark-Reliance is a global leader in the level indication and control, sight-flow indication, and filtration and 
separation industries.  Clark-Reliance is dedicated to offering the largest and broadest range of 
instrumentation products and being the single-source for every type of level measurement and control to 
meet the varying demands of the process industry. 
 
Jerguson® Gage and Valve, a leading supplier of level gaging products, offers the world’s largest selection 
of liquid level glass gages, magnetic level gages, liquid level switches and level transmitters.  Since 1905, 
Jerguson® gages and valves have been installed in a wide variety of liquid level applications, from basic 
chemical storage tanks to the most advanced nuclear aircraft carriers.  With complete product offerings in 
both traditional glass gages and magnetic gages, Jerguson® is able to satisfy customers’ diverse needs. 

2. Warranty 

Clark-Reliance warranties its manufactured goods as being free from defects in material and workmanship 
for one (1) year from the date of shipment.  If any of the goods are found by the seller to be defective, such 
goods will be replaced or repaired at the seller's cost.  Refer to the Clark-Reliance Terms & Conditions for 
full warranty details. 

3. About This Manual 

This manual is designed to aid and guide in the installation, operation and maintenance of the Jerguson 
360 Series family of valves.  Authorized personnel must read and understand all instructions before 
attempting to install, operate or maintain this equipment.  Only persons certified to perform work described 
herein should attempt any actions suggested.  Safety precautions and company safety standards should 
be observed at all times when performing the activities described in this manual. 

 

4. Inspection & Delivery 

Upon receiving valves, check all components carefully for damage incurred during shipping. Sign for the 
shipment noting “damaged” and immediately notify the shipping firm of any such damage and request 
damage inspection. Confirm valve model number, pressure and temperature ratings (on nameplate) meet 
application specifications. Also confirm that the material of construction is compatible with both the process 
fluid and surrounding atmosphere. 

 

5. Product Description 

The Jerguson® 360 Series Valve is unlike any other safety ballcheck valve on the market, featuring an 
innovative core design locating a ballcheck within a metal-seated valve. The handle is quarter-turn position 
visible so that you can easily see valve status (open or closed). A cleanout port opposite the vessel 
connection allows you to maintain the valve by flushing out the internals, even while mounted to the 
vessel. Each valve is equipped with locking pin and lock-out tag-out slot to enhance plant safety.  As a 
standard these valves are low emission certified to API 641 and ISO 15848-1. Valves meet API Class V 
shutoff requirements, and have wetted components that comply with NACE MR0103 and MR0175. 
Equipped on a Jerguson® armored glass gage, these valves eliminate common commissioning mistakes 
while enhancing plant safety.  
 
These valves must be installed, operated and maintained with reasonable care and due regard for the 
applications and environment if they are to provide safety and reliability for their service lifetime. 
 
 

 

 
 

Содержание Jerguson 360 Series

Страница 1: ...ay Strongsville OH 44149 USA Telephone 1 440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com Installation Operation Maintenance Instructions IOM J500 36 2017 10 360 Series Safety...

Страница 2: ...440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com Table of Contents 1 INTRODUCTION 3 2 WARRANTY 3 3 ABOUT THIS MANUAL 3 4 INSPECTION AND DELIVERY 3 5 PRODUCT DESCRIPTION 3 6 S...

Страница 3: ...all instructions before attempting to install operate or maintain this equipment Only persons certified to perform work described herein should attempt any actions suggested Safety precautions and com...

Страница 4: ...IOM J500 36 Jerguson 360 Series 2017 10 4 16633 Foltz Parkway Strongsville OH 44149 USA Telephone 1 440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com 6 Specifications...

Страница 5: ...ess connection the valve is in the Bypass Position The Bypass Position is intended for use while the gage is being commissioned when there is already liquid present in the vessel This mode of operatio...

Страница 6: ...to open the top valve first This allows the pressure of the vessel to equalize with the gage 3 Open the bottom valve to the bypass position This will allow liquid to flow from the vessel through the...

Страница 7: ...orn nut lock washer and spacer Secure valve into a vice with the large compression nut facing upward Take care not to damage any of the external components Remove anti rotation pin and discard Use lar...

Страница 8: ...he ball mechanism by sliding it off of the stem through the process opening 5 If you wish to replace or remove the internal ballcheck remove the ball retainer clip If not continue to step 6 6 Remove u...

Страница 9: ...hrust washer on stem flange Align side with chamfer on ID with face of stem flange Angle the stem and insert into valve body 2 Holding stem flange and washer pressed up against top of body install 3 n...

Страница 10: ...Torque nuts in X pattern to 15 20 in lb Visually confirm gland follower is level 4 Install Handle Back onto valve and cycle the stem several times Leave valve handle in the closed position 5 Replace...

Страница 11: ...ke shown Place the new upstream seat and seal into the inlet gland opening 8 Insert the inlet gland assembly from the previous step into the valve as shown 9 Secure valve into a vice with the large co...

Страница 12: ...IOM J500 36 Jerguson 360 Series 2017 10 12 16633 Foltz Parkway Strongsville OH 44149 USA Telephone 1 440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com...

Отзывы: