![Clark-Reliance Jerguson 360 Series Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/clark-reliance/jerguson-360-series/jerguson-360-series_installation-operation-and-maintenance-instructions-manual_2614344010.webp)
IOM J500.36
Jerguson
®
360 Series
2017.10
10
16633 Foltz Parkway ● Strongsville, OH 44149 USA ●
Telephone: +1 (440) 572-1500
●
Fax: +1 (440) 238-8828
www.Jerguson
.com ● sales@clark
-reliance.com
3. Install gland ring with bevel side up. Align gland follower over studs with bevel side down and press
flush onto gland. Place Belleville washers onto studs over gland follower, with first washer cupped
up and second washer cupped down, to form a diamond shape. Thread nuts onto studs and hand
tighten in “X” pattern until snug. Torque nuts in “X” pattern to 15-20 in-lb. Visually confirm gland
follower is level.
4. Install Handle Back onto valve and cycle the stem several times. Leave valve handle in the closed
position.
5. Replace upstream seat, and seal. Place into valve body.
6. Clean new ball mechanism thoroughly and apply a thin film of molykote or equivalent grease. Install
the ball into the valve taking care to ensure the slot matches the stem engagement. The ball
mechanism will only slide on the stem in one way. If the valve handle is rotated to the run position
the retainer clip should be showing out of the process opening as shown.
Gland Ring
Gland Follower
Belleville Washers & Nuts
Retainer Clip
(Handle In Run Position)