background image

20

21

4. Installation

Installing the Appliance

(a)

closed

open

•  The electrical power supply cable may be connected in the upper part or is surface 

mounted. Only in such case, first follow the steps one through three according to 

the description “Electrical connection from above” in chapter “Electrical connec-

tion”.

1.  Place the appliance on the heater bracket so that the threaded rod of the wall 

bracket fits in the corresponding hole of the appliance. If necessary, slight cor-

rections are possible by carefully bending the threaded rod of the wall bracket. 

However, it must be possible to screw on the water connection pipes of the appli-

ance without applying force.

2.  Screw the plastic knurled nut onto the threaded rod of the wall bracket.
3.  Screw the two ⅜ inch union nuts of the appliance‘s water connection pipes, each 

with the ⅜ inch seal, onto the fittings. 

4.  Open the water supply line to the unit and slowly open (position “open“) the shut-

off valve (a) in the cold water connection piece. Check all connections for leaks.

5.  Next, open and close the hot water tapping valve several times until no more air 

emerges from the line and all air has been eliminated from the instantaneous water 

heater.

Attention: Inspection Panel Opening
If DSN is to be installed in a sealed space (eg. under the ceiling with decorative 

paneling), must leave a 600x600 mm inspection panel for future maintenance and 

repair.

5. Direct Connection

Note: Fasten the screw nuts with caution, to avoid damage to the valves or the piping 

system. 

For direct connection, the two ½ inch screw-in nipples and the ½ inch seals must be 

screwed into the ½ inch union nuts of the hot-water and cold-water connectors. The 

two ½ inch caps of the side outlets of the hot-water and cold-water connectors must 

be removed and screwed onto the open end of the screw-in nipples. Put the water 

flow reducer “D” into the hot water connection piece. The hot-water and cold-water 

connectors must then be screwed into the 3/8 inch union nut of the appliance inlet 

and outlet pipe, together with the 3/8 inch seals. 
For direct connection, it may be advisable to mount the appliance at a distance as illus-

trated alongside, using the spacer sleeves supplied. The two fixing holes near the lower 

pipe connections are also to be professionally fixed with 6 mm dowels and screws.
The flared end of the pipes must be screwed into the ½ inch side outlets of the hot-

water and cold-water connectors with ½ inch union nuts and ½ inch seals. The holes 

required for the pipes must then be opened of the housing with the aid of a blunt 

implement.

Note: In case of direct connection, put the strainer into the cold water connection!

D

Содержание GERMAN POOL DEN12

Страница 1: ...ration U S E R M A N U A L DEN12 Instantaneous Electric Water Heater WH DEN12 M 21 3 Printed in Germany Please read these instructions and warranty information carefully before use and keep them handy...

Страница 2: ...ed to frost The values stated on the rating plate must be observed In case of malfunction disconnect the fuses immediately In case of leaks cut off the mains water supply instantly Repairs must only b...

Страница 3: ...the devices must not be blocked and the water flow must not be restricted The water outlet facilities such as shower head jet control and other outlet unit must be decalcified regularly Deposits must...

Страница 4: ...nd of their service life Therefore please take this device to a municipal collection point that return used electronic devices to the recycling system Disposing it correctly will support environmental...

Страница 5: ...tions Preset applications can be selected here Simply tap on the right sensor key to open the selection Tap on the sensor key under an application symbol to activate it The temperatures are set at the...

Страница 6: ...28HK 3 How To Use Operation Lock Secure your settings with a four digit PIN Note The operation lock can only be deactivated with the correct PIN under Protected Sections or under Delete PIN If you sh...

Страница 7: ...damp cloth Do not use abrasive or chlorine based cleaning agents or solvents For a good water supply the outlet fittings e g jet regulators and shower heads should be unscrewed and cleaned at regular...

Страница 8: ...filter dirty or calci fied Let clean fine filter by cus tomer service Selected temperature is not reached Power limit reached Decrease the warm water flow at the tap Cold water has been added via the...

Страница 9: ...70 468 363 56 96 239 Dimensions in mm The following regulations must be observed e g VDE 0100 EN 806 Installation must comply with all statutory regulations as well as those of the local electricity a...

Страница 10: ...hange for a conventional instantaneous water heater there is generally no need to drill holes for the wall brack et in this case step 2 would not be necessary Thoroughly rinse the water supply pipes b...

Страница 11: ...ening If DSN is to be installed in a sealed space eg under the ceiling with decorative paneling must leave a 600x600 mm inspection panel for future maintenance and repair 5 Direct Connection Note Fast...

Страница 12: ...ance with water by carefully opening and closing the hot water tap in order to vent completely To ensure a maximum flow remove any existing aerator from the faucet Flush the warm and cold water pipes...

Страница 13: ...Soiling of the strainer may reduce the warm water output Clean or replace the strainer as follows 1 De energize the instantaneous water heater e g via deactivating the fuses and prevent inadvertent re...

Страница 14: ...26 27 1 DEN12 20 C 60 C DEN12 70 C 2 5 1 27 2 27 3 28 28 28 28 28 28 29 29 30 30 30 32 32 32 32 33 33 4 34 1 35 2 36 3 37 4 37 37 38 39 39 40 5 41 6 42 42 42 42 7 43 43 44 44 44 8 45 45 45 47...

Страница 15: ...28 29 3 3 60 C 20 C 60 C 1 C 35 C 43 C 0 5 C 20 C 35 C 38 C 42 C 48 C PIN...

Страница 16: ...K PIN Protected Sectors PIN Lock Settings PIN PIN Lock Main Menu PIN Lock Temperature PIN PIN kWh m Factory Settings Delete Statistics HK 4 00HK 0 28HK 3 MAIN MENU STATISTICS SETTINGS OK Temperature U...

Страница 17: ...32 33 3 USER 4 INFO 70 C 3 1 2 3 4 5 10...

Страница 18: ...34 35 4 DSN PCB PCB 1 2 DEN12 5 1 SDB...

Страница 19: ...1 100 cm Model DEN12 A 8 8kW 11 5kW 38A 50A 220V 230V 240V 8 1kW 36 6A 10 5kW 47 8A 8 8kW 38 3A 11 5kW 50 0A 9 6kW 39 9A 12 5kW 52 2A 1 N PE 220V 230V 240V 10 0mm2 t 28 K t 38 K 4 5 3 3 5 9 1 4 3 0 4l...

Страница 20: ...38 39 RDX3 36100 RDX IP25 IP24 VDX 34120 RDX UDX 34110 RDX 4 RDX3 VDX UDX 2 1 12 12 14 2 6 3 4 30 1 1 2 2 1 2 3 D O 4 D...

Страница 21: ...40 41 a closed open 1 3 1 2 3 3 8 3 8 4 a 5 4 600x600 5 1 2 1 2 1 2 1 2 D 3 8 3 8 6 1 2 1 2 1 2 D...

Страница 22: ...42 43 6 e g VDE 0100 IEC 3 C 1 2 3 4 5 A 1 6 2 3 4 A 5 7 1 Approved DIN VDE0100 1 2 3 8 8 11 5 kW 4 OK 5 6 10 30 7 8 9 SDB MPS 230V 11 5kW 8 8kW 1 2 5 3 4...

Страница 23: ...44 45 7 EN60900 55 C 55 C 55 C 1 2 3 1 4 1 2 OFF 3 Pos OFF Pos 1 8 a closed open c b Strainer 1 2 3 a 4 b c 5 6 7 8 9 1 2 3 4 5 6 7 8 9...

Страница 24: ...4 5 www germanpool com Specifications are subject to change without prior notice If there is any inconsistency or ambiguity between the English version and the Chinese version the English version sha...

Страница 25: ...o Industrial Pou Fung 145 Rua de Francisco Xavier Pereira Macau Tel Fax 853 2875 2699 853 2875 2661 Macau All rights reserved Copying reproducing or using the contents of this manual is not allowed wi...

Отзывы: