No. Activity
Checked Date
1.
Flush pipework prior to installation.
2.
Ensure filters are fitted to the supplied pipe work
(see page 4 & 5 for details).
3.
Ensure water supply working/dynamic pressure is between
0.5 – 6 bar.
4.
Check product flow-rate suitability to application.
5.
Check all connections for leaks; ensure isolation valve is installed
before the tap internal valve models.
6.
Check flexible hose is not kinked/twisted.
7.
External taps: check flow direction of solenoid valve.
8.
Check electrical connections: tap to solenoid (external valves),
orange to orange, blue to blue. Ensure either mains or battery
power or multi product power supply unit is connected.
9.
Check operation, adjust sensor range and run-on time adjustment
(see advanced settings guide).
Product serial number
Installation address
Installer’s name
Telephone number
Email address
Commissioning check-list
The warranty on Cistermiser products can be extended within one year of
date of manufacture, at no cost, to three years from the date of installation.
Once the valve has been installed, complete the product commissioning
checklist below to demonstrate compliance with the installation instructions.
Email a photograph of this completed form to
or post to
Cistermiser, Unit 1, Woodley Park Estate, 59-69 Reading
Road, Woodley, Berks, RG5 3AN.
3
YEAR
warranty
extended
www.
cistermiser
.co.uk
| 13