![Cisco UCS X9508 Скачать руководство пользователя страница 88](http://html.mh-extra.com/html/cisco/ucs-x9508/ucs-x9508_installation-manual_67277088.webp)
Step 3
Using a T10 screwdriver, tighten the captive screws which are easily identifiable because they are next to the electrical
ground icons on the chassis walls.
a) Tighten the exterior captive screws.
b) Tighten the interior captive screws.
Cisco UCS X9508 Server Chassis Installation Guide
80
Installing and Removing Components
Installing the Power Entry Modules
Содержание UCS X9508
Страница 6: ...Cisco UCS X9508 Server Chassis Installation Guide vi Contents ...
Страница 26: ...Cisco UCS X9508 Server Chassis Installation Guide 18 Overview Interpreting LEDs ...
Страница 31: ...Cisco UCS X9508 Server Chassis Installation Guide 23 Installation Handling the Chassis ...
Страница 64: ...Cisco UCS X9508 Server Chassis Installation Guide 56 Installation Repacking the Chassis ...
Страница 124: ...Cisco UCS X9508 Server Chassis Installation Guide 116 Technical Specifications Switzerland ...