![Cisco UCS X9508 Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/cisco/ucs-x9508/ucs-x9508_installation-manual_67277050.webp)
Figure 22: Detach the Chassis Side Trim Panels
Step 4
At the front of the chassis, use a #3 Phillips-head screwdriver to insert and tighten the eight M6 x 20mm screws through
the front mounting flanges.
Cisco UCS X9508 Server Chassis Installation Guide
42
Installation
Inserting the Chassis into the Rack
Содержание UCS X9508
Страница 6: ...Cisco UCS X9508 Server Chassis Installation Guide vi Contents ...
Страница 26: ...Cisco UCS X9508 Server Chassis Installation Guide 18 Overview Interpreting LEDs ...
Страница 31: ...Cisco UCS X9508 Server Chassis Installation Guide 23 Installation Handling the Chassis ...
Страница 64: ...Cisco UCS X9508 Server Chassis Installation Guide 56 Installation Repacking the Chassis ...
Страница 124: ...Cisco UCS X9508 Server Chassis Installation Guide 116 Technical Specifications Switzerland ...