Step 2
When the SuperCap module is completely seated in its plastic case, pivot the securing lever to connect the ribbon cable
to the SuperCap module.
Step 3
Align the SuperCap module with its slot on the module and seat the module into the slot.
Make sure not to pinch the ribbon cable while inserting the SuperCap module into the slot.
Caution
Cisco UCS X210c M6 Compute Node Installation and Service Note
34
Servicing a Compute Node
Installing the SuperCap Module