Figure 13: Using the CPU Pick and Place Tool to Insert the CPU
Alignment mark on the
CPU socket
2
Alignment mark on the
tool button/handle
1
Step 6
Close the socket latch. See callout 1 in the following figure.
Step 7
Secure the first hook, which has the following icon:
See callout 2 in the following figure.
Step 8
Secure the second hook, which has the following icon:
See callout 3 in the following figure.
Cisco UCS B260 M4 and B460 M4 Blade Server Installation and Service Note for Servers with E7 v3 and E7 v2 CPUs
24
Servicing the Blade Server
Installing a New CPU and Heat Sink