e) Lift the tool and CPU straight up off of the pedestal.
Figure 12: Loading the Pick and Place Tool
Alignment mark on the pick and place tool, CPU
and pedestal
1
Step 4
Place the CPU and tool on the CPU socket with the registration marks aligned as shown.
Step 5
Press the button/handle on the pick and place tool to release the CPU into the socket.
Cisco UCS B260 M4 and B460 M4 Blade Server Installation and Service Note for Servers with E7 v3 and E7 v2 CPUs
23
Servicing the Blade Server
Installing a New CPU and Heat Sink