S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m
Contents
v
Cisco MDS 9200 Series Hardware Installation Guide
OL-19588-01
Installing the Cisco MDS 9200 Series Rear-Facing into Cabinet
2-16
System Grounding
2-19
Proper Grounding Practices
2-19
Preventing Electrostatic Discharge Damage
2-21
Establishing the System Ground
2-23
Required Tools and Equipment
2-23
Grounding the Chassis
2-24
Starting Up the Switch
2-26
Removing and Installing Components
2-28
Removing and Installing Switching and Services Modules
2-28
Removing a Caching Services Module
2-31
Removing Other Switching or Services Modules
2-32
Installing a Switching or Services Module, Including Caching Services Modules
2-33
Verifying Installation of a Switching or Services Module
2-34
Maintaining a Caching Services Module
2-35
Maintaining the Batteries on the Caching Services Module
2-35
Maintaining the Disk Drives on the Caching Services Module
2-35
Removing and Installing Power Supplies
2-36
Removing a Power Supply
2-36
Installing a Power Supply
2-36
Removing and Installing the Fan Module
2-38
Removing a Fan Module
2-39
Installing a Fan Module
2-39
Removing the Cisco MDS 9200 Series
2-40
C H A P T E R
3
Connecting the Cisco MDS 9200 Series
3-1
Preparing for Network Connections
3-2
Connecting to the Console Port
3-2
Connecting to the COM1 Port
3-4
Connecting to the MGMT 10/100 Ethernet Port
3-5
Connecting to a Fibre Channel Port
3-6
Removing and Installing X2 Transceivers
3-6
Installing an X2 Transceiver
3-8
Removing an X2 Transceiver
3-8
Removing and Installing SFP Transceivers
3-8
Installing an SFP Transceiver
3-9
Removing an SFP Transceiver
3-10
Removing and Installing Cables into SFP Transceivers
3-11
Installing a Cable into an SFP Transceiver
3-11