Setting
Switches
on Cards
and
Boards
DIP
Switches
Figure
2-8
Lifting
the
HyperSwitch
A100
Cover
Locate
the
BCONV
card
Optical
Carrier Level
0C3-LJNF
card and
PROC
card For
each
card
or
board
ensure
the switches
Dual
in-line
package
DIP
switchesjumper
switches
short
bars
are
set
to
initial
settings
All switches
are
factory-set
Jumper
Switches
Figure
2-9
shows
the
DIP
switch
setting
on
the
BCONV
card
P-8X54
If the
switch
setting
differs
from
its
initial
setting
return
it
to
the
initial
setting
indicated
in
the figure
Figure
2-10
shows
the
motherboard
P-8X84
jumper
switch
settings
If
the
switch
setting
differs
from
its
initial
setting
return
it
to
the
initial
setting
indicated
in
the figure
Setting
Switches
on
Cards
and
Boards
Installing
the HyperSwitch
Al 00
2-9
Содержание HyperSwitch A100
Страница 1: ...cIscoSYsTEMs ...
Страница 13: ...xii Cisco HyperSwitch AiQO User Guide ...
Страница 153: ...Error Messages 4 56 Cisco HyperSwitch A100 User Guide ...
Страница 173: ...Cisco I IyperSwitch A100 User Guide ...