5-7
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
OL-27038-01
Chapter 5 Installing the Displays and Performing Final Leveling of the Main Display Structure
Installing the Displays
Step 4
Perform final leveling of the display structure and tighten all connecting hardware.
Tip
You cannot level the displays without leveling the entire system. Raise or lower the leveling feet on the
bottom of the display structures to level the displays.