![Cisco CTS-TX9000 Скачать руководство пользователя страница 70](http://html.mh-extra.com/html/cisco/cts-tx9000/cts-tx9000_assembly-use-and-care-and-field-replaceable-unit-manual_64121070.webp)
4-6
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
OL-27038-01
Chapter 4 Installing And Performing Initial Leveling of the Main Display Structure
Installing and Leveling the Display Structure
Step 2
Place the left and right display structures in their its correct position in the room, then level the structures
using the same procedures as the center structure.
Level the left and right structures relative to the center structure, so that all structures are the same
height.
Note
You can level the structures vertically; however a rough leveling is sufficient, because the vertical
leveling will change after you install the displays onto the structure.
Figure 4-4
Placing and Leveling the Left and Right Display Structures
Key
Part Description
Part/Kit Number
Qty
Ctn
Notes
1
Display stand, center
800-37616-01
Kit #69-2323
1
1
2
Display stand, left
800-37615-01
Kit #69-2323
1
1
3
Display stand, right
800-37617-01
Kit #69-2323
1
1