4-13
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
OL-27038-01
Chapter 4 Installing And Performing Initial Leveling of the Main Display Structure
Installing and Leveling the Display Structure
Step 7
Install the middle and upper tie-bars to the display structure.
Note
16 of the 48 screws attach horizontally from the rear of the structure.
Note
Do not fully tighten the screws until you perform final leveling of the entire display structure.
Figure 4-11
Installing the Middle and Upper Tie-Bars to the Display Structure
Key
Part Description
Part/Kit Number
Qty
Ctn
Notes
1
Tie-bar assembly, middle and
upper, left
700-37119-01
Kit #69-2323-xx
2
1
2
Tie-bar assembly, middle and
upper, right
700-37118-01
Kit #69-2323-xx
2
1
3
M8 x 16mm pan head screws
48-3012-01
Kit #69-2365-xx
48
6