D-6
Cisco Content Delivery Engine 100/200/300/400 Hardware Installation Guide
OL-13478-03
Appendix D Connecting DC Power
Connecting DC Power to a CDE300
Step 3
Place the ring lugs at the end of the ground wires (green and yellow) attached to the DC power cable
connector over the Building/PM ground stud in the following order and secure with the nut (see
Figure D-6
):
Note
Fan the ring lugs and barrels so that they fit on the Building/PM ground stud (see
Figure D-6
).
–
Star washer
–
Building ground ring lug
–
Star washer
–
Nut
–
PM 1 ground ring lug
–
PM 2 ground ring lug
–
PM 3 ground ring lug
–
Star washer
–
Nut
Figure D-6
CDE300 Building/PM Ground Stud Order
Note
Install star washers between the ring lug and chassis ground connection so that the star washers dig into
the metalwork finish and make a good ground bond. Use a wrench to tighten the nut and secure the
connection.
1
Nut
4
Building ground ring lug
2
Star washer
5
Building/PM ground stud
3
PM ground ring lug
1
280226
2
3
3
3
1
2
4
2
5
Содержание Content Delivery Engine 100/200/300/400
Страница 6: ...Contents vi Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 ...
Страница 14: ...xiv Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Preface ...
Страница 16: ...xvi Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Preface ...