D-4
Cisco Content Delivery Engine 100/200/300/400 Hardware Installation Guide
OL-13478-03
Appendix D Connecting DC Power
Connecting DC Power to a CDE200
Figure D-4
CDE200 Building Ground Stud Order
Step 4
Attach the +Return (red) and –48 VDC (black) DC power wires to your power source.
The CDE200 is now ready for use.
Disconnecting Power and Replacing a PM on a CDE200
Warning
The PM connectors and PMs are not hot-swappable. You must disconnect the power source from the
building before disconnecting PM wires or removing PMs from a CDE.
Should you need to replace a PM, you must first disconnect DC power and remove the PM from the CDE
chassis. Perform the following steps:
Step 1
Remove the +Return (red) and –48 VDC (black) DC power wires from your power source.
Step 2
Remove the PM ground wires (green and yellow) from the PM ground stud.
Step 3
Loosen the screw and press the latch to release the PM from the chassis. Pull the handle and gently slide
the PM from the slot.
Step 4
Insert a new PM in the slot and make sure it is completely seated in the CDE.
Step 5
Reconnect the PM ground wires (green and yellow) to the PM ground stud as described in
Step 2
of the
“Connecting DC Power to a CDE200” section on page D-2
.
1
Nut
3
Building ground ring lug
2
Star washer
4
Building ground stud
280225
1
2
2
3
4
Содержание Content Delivery Engine 100/200/300/400
Страница 6: ...Contents vi Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 ...
Страница 14: ...xiv Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Preface ...
Страница 16: ...xvi Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Preface ...