background image

 

Americas Headquarters

Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706 
USA
http://www.cisco.com
Tel: 408 

526-4000

800 553-NETS (6387)

Fax: 408 

527-0883

Cisco Content Delivery Engine 100/200/300/400 
Hardware Installation Guide

March 2008

THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO 
CHANGE WITHOUT NOTICE. ALL STATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS 
MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT WARRANTY OF ANY KIND, 
EXPRESS OR IMPLIED. USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY 
PRODUCTS.

Text Part Number: OL-13478-03

Содержание Content Delivery Engine 100/200/300/400

Страница 1: ...Hardware Installation Guide March 2008 THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE ALL STATEMENTS INFORMATION AND RECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT WARRANTY OF ANY KIND EXPRESS OR IMPLIED USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCTS Text Part Number OL 1...

Страница 2: ...rom the television or radio Plug the equipment into an outlet that is on a different circuit from the television or radio That is make certain the equipment and the television or radio are on circuits controlled by different circuit breakers or fuses Modifications to this product not authorized by Cisco Systems Inc could void the FCC approval and negate your authority to operate the product The Ci...

Страница 3: ...isco Internet Streamer CDS Overview 1 1 Cisco TV CDS Overview 1 2 OnDemand Application 1 2 Video Accelerator Software 1 2 Hardware Features 1 3 Control Buttons 1 6 LED Indicators 1 8 Input Output Ports and Connectors 1 11 C H A P T E R 2 Preparing to Install the Content Delivery Engines 2 1 Site Requirements 2 1 Preventing Electrostatic Discharge Damage 2 1 Environmental Physical and Power Specifi...

Страница 4: ... Installing CDEs in the Rack 3 5 Making Physical Connections 3 5 Connecting Power Cords 3 6 Connecting Network Cables 3 8 Installing or Removing Disk Drives 3 9 C H A P T E R 4 Installing the Internet Streamer CDS Software and Initially Configuring a CDE 4 1 Before You Begin 4 1 Installation and Configuration Order 4 2 Running the BIOS Setup Utility 4 2 Running the BIOS Setup Utility for the CDE10...

Страница 5: ...et Port Connector B 3 Cable Pin Assignments B 4 A P P E N D I X C CDEs with Serverworks Chipset C 1 Specifications C 1 CDE100 C 1 CDE200 C 2 CDE200 IBM C 3 CDE300 C 3 CDE400 C 4 Connector Pin Assignments C 5 A P P E N D I X D Connecting DC Power D 1 DC Power Overview D 1 Connecting DC Power to a CDE200 D 2 Disconnecting Power and Replacing a PM on a CDE200 D 4 Connecting DC Power to a CDE300 D 5 D...

Страница 6: ...Contents vi Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 ...

Страница 7: ...The Document Revision History table below records technical changes to this document Document Organization Document Version Date Change Summary OL 13478 02 March 28 2008 Added CDE300 and CDE400 to this document OL 13478 01 August 20 2007 This is the first version of this document Chapter Description Chapter 1 Overview of the Content Delivery Engines Provides a brief introduction to the Content Del...

Страница 8: ...e Release Notes for the Cisco Internet Streamer CDS 2 0 Release Notes for the Cisco Internet Streamer CDS 2 1 Cisco Internet Streamer CDS 2 0 2 1 Software Configuration Guide Cisco Internet Streamer CDS 2 0 2 1 Quick Start Guide Cisco Internet Streamer CDS 2 0 2 1 API Guide Cisco Content Delivery System 2 x Documentation Roadmap Regulatory Compliance and Safety Information for the Cisco Content De...

Страница 9: ... could result in equipment damage or loss of data Safety Information Referral Warning See the foreign language translations of all warnings used in the Regulatory Compliance and Safety Information for the Cisco Content Delivery Engine 100 200 300 400 document at this URL http www cisco com en US docs video cds cde regulatory compliance CDE_RCSI html Warning Definition Warning IMPORTANT SAFETY INST...

Страница 10: ...rporels Avant de travailler sur un équipement soyez conscient des dangers liés aux circuits électriques et familiarisez vous avec les procédures couramment utilisées pour éviter les accidents Pour prendre connaissance des traductions des avertissements figurant dans les consignes de sécurité traduites qui accompagnent cet appareil référez vous au numéro de l instruction situé à la fin de chaque av...

Страница 11: ...tilize o número da instrução fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham este dispositivo GUARDE ESTAS INSTRUÇÕES Advertencia INSTRUCCIONES IMPORTANTES DE SEGURIDAD Este símbolo de aviso indica peligro Existe riesgo para su integridad física Antes de manipular cualquier equipo considere los riesgos de la corriente eléctrica y famil...

Страница 12: ...em uma situação em que há risco de lesões corporais Antes de trabalhar com qualquer equipamento esteja ciente dos riscos que envolvem os circuitos elétricos e familiarize se com as práticas padrão de prevenção de acidentes Use o número da declaração fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham o dispositivo GUARDE ESTAS INSTRUÇÕES ...

Страница 13: ...r dig i en situation med risiko for legemesbeskadigelse Før du begynder arbejde på udstyr skal du være opmærksom på de involverede risici der er ved elektriske kredsløb og du skal sætte dig ind i standardprocedurer til undgåelse af ulykker Brug erklæringsnummeret efter hver advarsel for at finde oversættelsen i de oversatte advarsler der fulgte med denne enhed GEM DISSE ANVISNINGER ...

Страница 14: ...xiv Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Preface ...

Страница 15: ...rmation see the monthly What s New in Cisco Product Documentation which also lists all new and revised Cisco technical documentation at http www cisco com en US docs general whatsnew whatsnew html Subscribe to the What s New in Cisco Product Documentation as a Really Simple Syndication RSS feed and set content to be delivered directly to your desktop using a reader application The RSS feeds are a ...

Страница 16: ...xvi Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Preface ...

Страница 17: ...ed Service Engines and Service Routers The CDS solution addresses the need to distribute and receive high bandwidth media rich content across the Internet without performance losses or content delivery delays CDS software offers the following content based services Content caching and hosting Proxy services Content replication Video streaming To deploy Cisco SEs with Cisco CDS software within your...

Страница 18: ... Demand solution has three major elements A Vault Group consisting of one or more CDE200s or CDE400s The Vault Group is responsible for ingest and reliable storage of Video On Demand content The number of CDE200s or CDE400s in the Vault Group is driven by the amount of content that the Video On Demand system offers One or more Streaming Groups each consisting of one or more CDE300s The Streaming G...

Страница 19: ...Storage Streaming Bandwidth usage for ingests Bandwidth usage for streaming Mirroring content among Vault servers Decisions on content retention on Streamer servers Hardware Features The Cisco Internet Streamer and TV CDS Release 2 0 2 1 CDEs are the CDE100 CDE200 CDE300 and CDE400 Figure 1 1 shows the front view of the CDE100 and Figure 1 2 shows the rear view of the CDE100 Figure 1 1 CDE100 Fron...

Страница 20: ... the Content Delivery Engines Hardware Features Figure 1 4 CDE200 Rear View Figure 1 5 shows the front view of the CDE300 and Figure 1 6 shows the rear view of the CDE300 with the AC power option Figure 1 5 CDE300 Front View Figure 1 6 CDE300 Rear View eth5 eth4 eth3 eth2 eth5 eth4 eth3 eth2 210821 270603 270594 ...

Страница 21: ...faces Figure 1 7 CDE400 Front View Figure 1 8 CDE400 Rear View Each CDE is designed to be rack mounted in a standard 19 inch rack with a depth of 30 inches Table 1 1 shows the hardware features of each CDE 270602 270592 Table 1 1 CDE Hardware Features CDE Rack Unit RU Processor Memory Drives GE Ports Ethernet Interface CDE100 1 1 dual core Intel Xeon processor 4 GB 4 150 GB Small Computer System I...

Страница 22: ...ssors Up to 16 GB Up to 24 SATA hard drives3 84 1 Provides management communication with the CDSM 2 Normally configured with 12 full duplex Gigabit Ethernet GE interfaces each used to deliver up to 250 simultaneous streams and to receive new content from the CDE200 or CDE400 3 Each drive contains 300 or 400 GB of storage Each CDE400 can therefore contain up to 2400 hours of standard definition con...

Страница 23: ...ntrol buttons Figure 1 10 CDE200 Front Panel Control Buttons Figure 1 11 shows the CDE300 front panel with the front cover removed and describes the front panel control buttons Figure 1 11 CDE300 Front Panel Control Buttons 1 Power Powers up the device 2 Reset Resets the device and runs the power on self test POST 211767 1 2 1 2 1 Power Powers up the device 2 Reset Resets the device and runs the p...

Страница 24: ...e Features Figure 1 9 shows the CDE400 back panel and describes the back panel control buttons Figure 1 12 CDE400 Back Panel Control Buttons LED Indicators Figure 1 13 shows the location of the CDE100 front panel LEDs and describes their functions 1 Power Powers up the device 2 Reset Resets the device and runs the power on self test POST 1 2 203753 ...

Страница 25: ... Power is flowing to the drive 2 Hard disk drive activity Blue On Associated hard disk drive is in use 3 Hard disk drive activity Blue On A hard disk drive is in use 4 Ethernet port 1 Blue On Port is connected 5 Ethernet port 2 Blue On Port is connected 6 Power Blue On Device is powering on 7 CD ROM drive activity Blue On CD ROM drive is in use 211768 7 4 6 5 3 2 1 No LED Color State Description 1...

Страница 26: ...ure 1 16 CDE400 Front Panel LEDs No LED Color State Description 1 Hard disk drive power Blue On Power is flowing to the drive 2 Hard disk drive activity Blue On Associated hard disk drive is in use 3 Hard disk drive activity Blue On A hard disk drive is in use 4 Ethernet port 1 Blue On Port is connected 5 Ethernet port 2 Blue On Port is connected 6 Power Blue On Device is powering on 270626 7 4 1 ...

Страница 27: ... PS 2 mouse USB interface serial console interface and VGA interface cables must be disconnected from the CDE s front and rear I O ports Figure 1 17 shows the location of the CDE100 back panel ports and connectors Figure 1 17 CDE100 Connector Locations Note The system software does not support the use of a keyboard or mouse Personal System 2 PS 2 or Universal Serial Bus USB However the keyboard an...

Страница 28: ...e interface numbering must be taken into consideration when configuring IP addresses and port channels Figure 1 19 shows the location of the CDE300 back panel ports and connectors Figure 1 19 CDE300 Connector Locations 1 Power connectors 5 VGA interface 2 Mouse connector 6 Management interface eth0 3 Keyboard connector 7 Ingest interface eth1 4 Serial console interface 8 Stream interfaces eth2 thr...

Страница 29: ...1 20 shows the location of the CDE400 back panel ports and connectors Figure 1 20 CDE400 Connector Locations 1 Power connectors 5 VGA interface 2 Mouse connector 6 Management Interface eth0 3 Keyboard connector 7 Ingest Interface eth1 4 Serial console interface 8 Cache Stream interfaces eth2 through eth7 270604 eth0 eth1 eth2 eth3 eth4 eth5 eth6 eth7 5 4 6 7 1 2 3 8 ...

Страница 30: ...1 14 Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Chapter 1 Overview of the Content Delivery Engines Hardware Features ...

Страница 31: ... 400 document that came with your device before you begin the installation Site Requirements This section provides site requirements for the CDEs You should verify the site power prior to installing the CDEs Preventing Electrostatic Discharge Damage The CDEs have no user serviceable parts inside their chassis The only field replaceable units are the AC and DC power supplies and hard disk drives Wa...

Страница 32: ... NEBS Physical Protection and the Bellcore GR 1089 CORE EMC and Electrical Safety Generic Criteria for Network Telecommunications Equipment Table 2 2 provides the physical dimensions of the CDEs Table 2 1 Environmental Specifications Summary Environment Specification Temperature operating 0 to 50 C 32 to 122 F Temperature non operating 40 C to 70 C 104 F to 158 F Altitude 60 to 4000 m Humidity non...

Страница 33: ...ess can only be gained by service personnel through the use of a special tool lock and key or other means of security and is controlled by the authority responsible for the location Statement 37 Warning Before working on equipment that is connected to power lines remove jewelry including rings necklaces and watches Metal objects will heat up when connected to power and ground and can cause serious...

Страница 34: ...intended for installation in restricted access areas A restricted access area can be accessed only through the use of a special tool lock and key or other means of security Statement 1017 Warning Take care when connecting units to the supply circuit so that wiring is not overloaded Statement 1018 Warning The plug socket combination must be accessible at all times because it serves as the main disc...

Страница 35: ...032 Warning Ultimate disposal of this product should be handled according to all national laws and regulations Statement 1040 Warning This product requires short circuit overcurrent protection to be provided as part of the building installation Install only in accordance with national and local wiring regulations Statement 1045 Warning Installation of the equipment must comply with local and natio...

Страница 36: ...uce the risk of bodily injury electrical shock fire and damage to the equipment observe the precautions in this section General Precautions Observe the following general precautions for using and working with your system Observe and follow service markings Do not service any Cisco product except as explained in your system documentation Opening or removing covers that are marked with the triangula...

Страница 37: ... cable Observe power strip ratings Make sure that the total ampere rating of all products plugged into the power strip does not exceed 80 percent of the power strip ampere ratings limit Do not use appliance or voltage converters or kits sold for appliances with your product To help protect your system components from sudden transient increases and decreases in electrical power use a surge suppress...

Страница 38: ...er cord s is considered the mains disconnect for the server and must be readily accessible when installed If the individual server power cord s will not be readily accessible for disconnection then you must install an AC power disconnect for the entire rack unit This main disconnect must be readily accessible and it must be labeled as controlling power to the entire rack not just to the server s G...

Страница 39: ...ce when easily accessible and should be rated no more than 10 amps Grounding the server This server is intended for installation with an isolated DC return DC I and is to be installed in a Common Bonding Network CBN per NEBS GR 1089 To avoid the potential for an electrical shock hazard you must reliably connect an earth grounding conductor to the server The earth grounding conductor must be 14 to ...

Страница 40: ...rack must be between 0 to 50 C 32 to 122 F Extreme fluctuations in temperature can cause a variety of problems in your server Caution Ventilation The equipment rack must provide sufficient airflow to the front of the server to maintain proper cooling The rack must also include ventilation sufficient to exhaust a maximum of 1023 BTUs British Thermal Units per hour for the server The rack selected a...

Страница 41: ...mber 1 2006 and contain the Serverworks chipset see Appendix C CDEs with Serverworks Chipset Server Types There are two types of CDS Internet Streamer IS and TV Both types of CDS consists of servers that are connected through Ethernet switches The Intel Xeon based servers are populated with multiple high capacity hard drives There are three distinct server types in the IS Content Delivery System C...

Страница 42: ...ver you handle Cisco equipment Installation and maintenance personnel should be properly grounded through the use of grounding straps to eliminate the risk of ESD damage to the equipment Modules are subject to ESD damage whenever they are removed from the chassis To unpack the shipping container follow these steps Step 1 Inspect the packing containers If any damage or other signs of mishandling ar...

Страница 43: ...enter during the applicable warranty period Contact Cisco Technical Support for the location of your nearest service center Note Before proceeding with the installation verify that all of the ordered parts are present and in good condition Keep a record of the parts and serial numbers If any parts are missing or damaged contact your sales representative Installing the CDEs Installing the CDS consi...

Страница 44: ...ve is connected to the secondary IDE cable There are two IDE connectors on the motherboard The one parallel to the front panel of the chassis is the primary IDE connector The one in the upright position is the secondary IDE connector If necessary swap the internal CD ROM drive with the compact flash drive to ensure that the compact flash drive is connected to the secondary IDE cable CDE200 a Make ...

Страница 45: ...ture Do not exceed the ambient temperature of 32 to 122 F 0 to 50 C Reduced airflow Install equipment so that the amount of airflow for safe operation of the equipment is not compromised the recommended amount is a a minimum of 1 RU between all servers Mechanical loading Mount equipment so that a hazardous condition is not achieved because of uneven mechanical loading Making Physical Connections A...

Страница 46: ...VDC power ports and the CDE400 chassis contains four VAC or VDC power ports See Appendix D for information connecting DC Power Note All unlabeled ports are unused ports Do not install cables in any unused ports Figure 3 1 CDE100 Connector Locations Figure 3 2 CDE200 or CDE200 ISV Connector Locations 1 Power connector 5 VGA interface 2 Mouse connector 6 Management interface eth0 3 Keyboard connecto...

Страница 47: ...A interface 2 Mouse connector 6 Management interface eth0 3 Keyboard connector 7 Stream interfaces eth2 through eth9 4 Serial console interface 280471 eth4 eth5 eth2 eth0 eth3 eth1 eth6 eth7 eth8 eth9 4 5 7 1 6 6 2 3 6 1 Power connectors 5 Cache stream interfaces 2 Serial console interface 6 Mouse connector 3 VGA interface 7 Keyboard connector 4 Management interface eth0 270606 eth4 eth5 eth2 eth0...

Страница 48: ...uses SEs and SRs that are collocated the Ethernet cables are used to make the following physical connections SR to switch SE to switch CDSM to switch Vault and Streamer System In a system that uses Vaults and Streamers that are collocated the Ethernet cables are used to make the following physical connections Vault to switch Streamer to switch CDSM to switch 1 Power connectors 5 VGA interface 2 Mo...

Страница 49: ...rive from the chassis The disk drives on the CDE100 are monitored using Self Monitoring Analysis and Reporting Technology S M A R T and statistics are displayed through the Administrative Interface as well as sent to the CDSM For more information about S M A R T see the Cisco Internet Streamer CDS 2 0 2 1 Software Configuration Guide The CDE100 contains 4 disk drives see Figure 3 6 the CDE200 cont...

Страница 50: ...Locations Figure 3 9 CDE400 Disk Drive Locations 211772 disk00 disk00 disk08 disk08 disk16 disk16 disk02 disk02 disk10 disk10 disk18 disk18 disk04 disk04 disk12 disk12 disk20 disk20 disk06 disk06 disk14 disk14 disk22 disk22 270603 270615 disk40 disk40 disk32 disk32 disk24 disk24 disk16 disk16 disk08 disk08 disk00 disk00 disk42 disk42 disk34 disk34 disk26 disk26 disk18 disk18 disk10 disk10 disk02 d...

Страница 51: ...ss the disk drives on a CDE200 CDE300 and CDE400 you must first remove the front cover by turning the keys on the left and right sides of the cover and removing it from the CDE see 1 and 2 in Figure 3 10 Figure 3 10 CDE200 Front Cover Step 3 Unlock the latch by pressing the safety lock button on the front of the latch see Figure 3 11 Step 4 Unlatch the disk drive tray from the locking clip and swi...

Страница 52: ...Engines Installing the CDEs Figure 3 11 Disk Drive Tray Installation and Removal Note Once the servers are powered up a Cisco technician will initially configure the servers to be able to communicate properly Further configuration is accomplished through the CDSM See the Cisco TV CDS Software Configuration Guide for more information ...

Страница 53: ... Initially Configuring a CDE page 4 14 Verifying the CDSM page 4 15 Before You Begin You need the following to perform the initial installation and configuration of the CDS CDE100 or CDE200 USB CD ROM drive for CDE200 only provided Internal IDE compact flash drive pre installed Terminal server connection with the following parameters 9600 baud 8 bits No parity Redirection After BIOS POST is off in...

Страница 54: ...Installation and Configuration Order Perform the initial installation and configuration of your CDS network in the following order 1 Run the BIOS setup utility on each CDE in the CDS network 2 Install the CDS Release 2 0 2 1 software on each CDE in the CDS network 3 Configure the CDSM Caution It is very important that the onboard SCSI controller be disabled on the CDE200 Do this by physically open...

Страница 55: ...ep 3 Reboot the CDE100 and wait for the initial BIOS screen to appear Note Step 4 through Step 16 are required only for the initial installation The BIOS setup does not need to be changed for the second and subsequent installations or recovery Step 4 To enter the BIOS Setup menu press Delete as instructed at the bottom of the BIOS screen The Main menu appears see Figure 4 1 Figure 4 1 Main Menu Ti...

Страница 56: ...Boot Settings Menu Step 6 From the Boot Settings menu choose Boot Settings Configuration and press Enter The Boot Settings Configuration screen appears see Figure 4 3 Figure 4 3 Boot Settings Configuration Screen a Set the Quick Boot option to Enabled b Set the Quiet Boot option to Disabled Step 7 Press Esc to return to the Boot menu and choose Boot Device Priority The Boot Device Priority screen ...

Страница 57: ...ents into the following order 1 CD ROM drive first boot device 2 Flash device first hard drive 3 Removable devices 4 Network device Caution The devices must be in the correct order for the installation to be successful Step 9 Use the Down Arrow key to expand the hard disk drive and expose its subelements see Figure 4 5 Figure 4 5 Hard Disk Drives Screen Step 10 Press Esc to return to the Main menu...

Страница 58: ...n appears see Figure 4 7 Figure 4 7 IDE Configuration Screen a Set the IDE Configuration option to P ATA Only b Set the S ATA Running Enhanced Mode option to No c Set the P ATA Channel Selection option to Both Note On the CDE100 the Primary IDE Slave is connected to the internal CD ROM drive the Secondary IDE Master is connected to a 128 MB compact flash drive Step 12 Press Esc to return to the Ad...

Страница 59: ... 13 Press Esc to return to the Advanced menu Choose Remote Access Configuration and press Enter The Configure Remote Access Type and Parameters screen appears see Figure 4 9 Figure 4 9 Configure Remote Access Type and Parameters Screen a Set the Serial port number option to COM 1 b Set the Serial Port Mode option to 9600 8 n 1 c Set the Redirection After BIOS POST option to Disabled Step 14 When y...

Страница 60: ...displayed at the conclusion of this boot sequence Welcome to the installer The installer enables installation of a new software image onto your system or recovers a previous image in the event that the hardware was changed MODEL CDE100 FLASH found directory validated COOKIE valid IMAGE DEVELOPMENT jbohach lnx02 data jbohach ws ipvideo refact dev 1 FLASHDEV dev hdX Installer Main Menu 1 Configure N...

Страница 61: ... Power on the USB CD ROM drive Step 4 Power on the CDE200 and wait for the initial BIOS screen to appear Note Step 5 through Step 12 are required only for the initial installation The BIOS setup does not need to be changed for the second and subsequent installations or recovery Step 5 To enter the BIOS Setup menu press Delete as instructed at the bottom of the BIOS screen The Main menu appears see...

Страница 62: ...OS Setup Utility Figure 4 12 Advanced Menu Step 7 Choose Boot Features and press Enter The Boot Features screen appears see Figure 4 13 Figure 4 13 Boot Features Screen a Set the QuickBoot Mode option to Enabled b Set the Quiet Boot option to Disabled c Set the After Power Failure option to Power On Step 8 Use the Down Arrow key to expand Hard Drive and expose its subelements see Figure 4 14 ...

Страница 63: ...irst boot device 2 Flash device first hard drive 3 Removable devices 4 Network device Caution The devices must be in the correct order for the installation to be successful Step 10 Press Esc to return to the Main menu To configure IDE set the IDE Channel 0 Master option to None and the IDE Channel 1 Master option to 128 this is compact flash card see Figure 4 15 Figure 4 15 Main Menu Note On the C...

Страница 64: ... the Continue C R after POST option to On Step 12 When you are finished navigate to the Exit submenu and choose Exit Saving Changes Press Yes when prompted see Figure 4 17 Figure 4 17 Exit Saving Changes Screen Step 13 Ensure that the CD with the CDS software image is in the USB CD ROM drive and press Enter to confirm and reboot the system Your configuration is saved you exit the BIOS Setup menu a...

Страница 65: ...ecovers a previous image in the event that the hardware was changed MODEL CDE200 FLASH found directory validated COOKIE valid IMAGE DEVELOPMENT jbohach lnx02 data jbohach ws ipvideo refact dev 1 FLASHDEV dev hdX Installer Main Menu 1 Configure Network 2 Manufacture flash 3 Install flash cookie 4 Install flash image from network 5 Install flash image from cdrom 6 Install flash image from disk 7 Wip...

Страница 66: ...M drive disconnect the CD ROM drive from the CDE and choose Option 8 to exit and reboot Press Y and Enter to confirm the reboot request The system boots from the IDE compact flash drive with the data installed from the CD All prior data is removed and the original system remains unaffected Caution Be sure to disconnect the CD ROM drive before rebooting the system or the system will not boot with t...

Страница 67: ...ess of this interface 209 165 200 255 Please enter the netmask of this interface 255 255 255 244 Please enter the default gateway 10 0 0 0 Please enter the domain name server ip 172 16 0 0 Please enter the domain name spcdn com Please enter the hostname CDStr1 Please enter CDSM Content Delivery System Manager IP or Host name 209 165 201 0 Press any key to continue CDE configure terminal CDE cms en...

Страница 68: ...8 03 Chapter 4 Installing the Internet Streamer CDS Software and Initially Configuring a CDE Verifying the CDSM Figure 4 18 CDSM Login Page Step 2 Enter admin as the username and default as the password and press Login The CDSM Main menu appears see Figure 4 19 Figure 4 19 CDSM Main Menu ...

Страница 69: ... Figure 4 20 Devices Page Step 4 Verify that the devices you configured for your CDS network are listed Step 5 If a device is not listed restart the CMS for that device by using either the console or Telnet connection and entering the following commands in global configuration mode CDE config no cms enable CDE config cms enable The installation is now complete Refer to the Cisco Internet Streamer ...

Страница 70: ...4 18 Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Chapter 4 Installing the Internet Streamer CDS Software and Initially Configuring a CDE Verifying the CDSM ...

Страница 71: ...e other end of the Ethernet cable is powered up Verify that the LED is on for each switch port that is connected to an adapter Do not be alarmed if an LED is not lit on an adapter when power is applied to the system LED illumination at system startup is dependent on the version of the adapter LEDs on all configured adapters should be lit once the CDS has been started Step 5 Verify that the port co...

Страница 72: ...f 8 SATA drives for a total of 24 SATA drives The SATA controller cards are located in slots 1 5 and 6 counting from the right as you are facing the rear of the chassis see Figure 3 7 on page 3 10 If the system reports that there is a problem with the SATA drives such as the drives not being recognized or are being reported as bad perform the following steps Step 1 Reboot the system Step 2 Reseat ...

Страница 73: ...following sections Specifications page A 1 Management page A 4 Note This appendix only provides information on CDEs that were shipped after December 1 2006 and contain the Lindenhurst chipset For information on CDEs that were shipped before December 1 2006 and contain the Serverworks chipset see Appendix C CDEs with Serverworks Chipset Specifications This section contains the technical specificati...

Страница 74: ...48 26 x 70 10 cm Weight fully configured 35 lb 15 88 kg Approvals Safety UL 1950 3rd edition Approvals EMC FCC Part 15 Class A USA Rack units 2 Storage 6 TB SATA 12x 500 GB SATA Memory 8 Gigabytes DRAM Network interfaces Copper Four 10 100 1000BASE T Fiber Four 1000BASE SX Other interfaces Two 10 100 1000BASE T on motherboard one for out of band management One serial port for console Compact Flash...

Страница 75: ...imensions H x W x D 4 75 x 17 25 x 27 50 in 12 1 x 43 8 x 69 9 cm Weight fully configured 125 lb 56 7 kg Approvals Safety UL 1950 3rd edition Approvals EMC FCC Part 15 Class A USA Rack units 4 Storage 12 TB SATA 24x 500 GB SATA disks Memory 4 Gigabytes DRAM Network interfaces Copper Six 10 100 1000BASE T Fiber Six 1000BASE SX Other interfaces Two 10 100 1000BASE T on motherboard one for out of ban...

Страница 76: ...478 03 Appendix A Technical Specifications Management Management Data Rate 2 Gbps maximum Ports Console port DB 9 RS 232 10 100 1000 Mbps Ethernet interface RJ 45 management Input Cables For console port DB 9 female serial cable For Ethernet interface RJ 45 Category 5E or higher cable ...

Страница 77: ...cember 1 2006 and contain the Serverworks chipset see Appendix C CDEs with Serverworks Chipset Serial Console Interface Connector Pin Assignments The serial console interface connector is a 9 pin RS 232 D type DTE connector A null modem cable is required to connect a workstation running the Linux or Windows operating system Table B 1 lists the pin assignments for the serial console interface conne...

Страница 78: ...Assignments The Ethernet connector is an 8 pin modular RJ 45 connector Table B 2 through Table B 4 list the Ethernet connector pin assignments 1 5 6 9 83193 Table B 2 Ethernet Connector Pin Assignments for T568A RJ 45 Pin Wire Color T568A Wire Diagram T568A 10BASE T 100BASE T 1000BASE T Signal 1 White Green Transmit BI_DA 2 Green Transmit BI_DA 3 White Orange Receive BI_DB 4 Blue Unused BI_DC 5 Wh...

Страница 79: ...ort connect a Category 3 4 or 5 unshielded twisted pair UTP cable to the RJ 45 connector on the back of the device Note The 100BASE TX 1000BASE TX Ethernet standard requires that the cabling in the network be Category 5 or higher 5 White Blue Unused BI_DC 6 Green Receive BI_DB 7 White Brown Unused BI_DD 8 Brown Unused BI_DD Table B 4 RJ 45 Crossover Cable Pin Assignments for T568B RJ 45 Pin End 1 ...

Страница 80: ...45 Ethernet Port Connector Cable Pin Assignments Figure B 3 through Figure B 5 show the pin assignments for the cable connection for an RS 232 null modem RJ45 straight through and RJ 45 crossover cable respectively Figure B 3 Pin Assignments for RS 232 Null Modem 1 8 Link LED green Activity LED green 83195 RXD TXD GND DB 9 Female End view 5 1 9 6 DB 9 Female 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 TO ...

Страница 81: ... B 4 Pin Assignments and Wiring for an RJ 45 Straight Through Cable Figure B 5 Pin Assignments and Wiring for an RJ 45 Crossover Cable 211778 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 Brown White Brown White Blue White Green White Orange Orange Blue Green 211779 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 Brown White Brown White Blue White Green White Orange Orange Blue Green ...

Страница 82: ...B 6 Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Appendix B Connector Pin Assignments Cable Pin Assignments ...

Страница 83: ...ll slots filled 35 lb 15 88 kg Database Storage Capacity 4 Serial ATA 74 or 320 GB hard drives Management Interface 1 Gigabit Ethernet interface Memory 4 Gigabytes RAM Processor Pentium 4 3 6 GHz 800 MHz FSB 1 MB Cache Protocols IP SNMP FTP Gigabit Ethernet SSH Operating System Red Hat 9 0 distribution supporting Linux kernel 2 4 30 Operating System Disk 60 GB small form factor IDE hard drive Cabl...

Страница 84: ...ls IP SNMP FTP Gigabit Ethernet SSH FSI DSM CC LSCP RTSP Controllers Marvell Serial ATA Operating System Red Hat 7 3 distribution supporting Linux kernel 2 4 19 Operating System Disk Two 60 GB small form factor IDE hard drives Cable length Twisted Pair Maximum of 330 ft 100 m using Category 5E or higher 4 pair Fiber Optic SX multimode 1640 ft 500 m maximum 50 125 mm 902 ft 275 m maximum 62 5 125 m...

Страница 85: ... 5E or higher 4 pair Fiber Optic SX multimode 1640 ft 500 m maximum 50 125 mm 902 ft 275 m maximum 62 5 125 mm Performance Monitoring Integrate with both the Tandberg and C COR back office suite Power 625 W 110 and 220 VAC or 48 VDC redundant hot swappable1 1 The power supplies for the CDE200 ISV server has not been investigated for hot swapping Fan Assembly Redundant with operation alarm monitore...

Страница 86: ...98 96 hours Altitude 197 to 13120 ft 60 to 4000 m Dimensions H x W x D 7 00 4U 17 25 26 50 in 17 8 43 8 67 3 cm Weight Chassis fully configured all slots filled 150 lb 68 0 kg Content Storage Capacity 24 Serial ATA 320 400 or 500 GB hard drives Management Interface 1 Gigabit Ethernet interface Ingest Interface 1 Gigabit Ethernet interface Cache or Stream Interfaces 4 or 6 Gigabit Ethernet interfac...

Страница 87: ...48 VDC redundant hot swappable Fan Assembly Redundant with operation alarm monitored by system Operating Temperature 32 to 122 F 0 to 50 C Humidity 5 to 95 noncondensing Short Term Humidity 5 to 98 96 hours Altitude 197 to 13120 ft 60 to 4000 m 1 Power connectors 4 Serial console interface 2 Mouse connector 5 VGA interface 3 Keyboard connector 6 Management interface eth0 270611 4 3 1 5 6 2 1 Power...

Страница 88: ...ort channels Figure C 3 shows the location of all connectors for a CDE200 IBM Figure C 3 CDE200 IBM Connector Locations Figure C 4 shows the location of all the connectors for a CDE300 Figure C 4 CDE300 Connector Locations 1 Serial console interface 5 Ingest Interface eth2 2 Mouse connector 6 Management Interface eth0 3 Keyboard connector 7 Stream interfaces eth3 eth4 eth5 4 VGA interface 8 Power ...

Страница 89: ...our cache interfaces Figure C 5 CDE400 with Four Cache Interfaces Connector Locations Figure C 6 shows the location of all the connectors for a CDE400 with six cache interfaces 1 Power connectors 5 VGA interface 2 Keyboard connector 6 Management interface eth2 3 Mouse connector 7 Ingest interface eth1 4 Serial console interface 8 Cache Stream interfaces eth3 through eth6 270608 eth4 eth3 eth6 eth5...

Страница 90: ...Pin Assignments Figure C 6 CDE400 with Six Cache Interfaces Connector Locations 1 Power connectors 5 VGA interface 2 Keyboard connector 6 Management interface eth0 3 Mouse connector 7 Cache Stream interfaces eth3 through eth8 4 Serial console interface 8 Ingest interface eth2 270609 eth2 eth7 eth8 eth6 eth5 eth4 eth3 eth1 eth0 4 5 7 1 6 2 3 ...

Страница 91: ...nnecting DC Power to a CDE consult the Regulatory Compliance and Safety Information for the Cisco Content Delivery Engine 100 200 300 400 document for important regulation and safety information DC Power Overview The CDE200 CDE300 and CDE400 can accept DC power CDE100s do not have a DC power option The CDEs can accept power from a 48 VDC 42 to 56 VDC source that connects to one primary or two seco...

Страница 92: ...ound studs and PMs Figure D 2 CDE200 Rear Panel Connect DC power to the CDE200 by performing the following steps Caution Make sure the DC power wires are not attached to the DC power source until all the ground wires are connected on the CDE Step 1 Insert a blue DC power cable connector into the blue port on each PM making sure it is completely seated Step 2 Attach the ground wires from PM 1 and P...

Страница 93: ...p 3 Attach the building ground wire to the building ground stud see Figure D 4 Warning The DC ground connection in the CDE serves as a functional earth point to maintain the full EMI and EMC integrity of the equipment The purpose is to mitigate the damaging effects of electrostatic discharge This connection should be installed by a trained service person and the equipment is to be installed per lo...

Страница 94: ...need to replace a PM you must first disconnect DC power and remove the PM from the CDE chassis Perform the following steps Step 1 Remove the Return red and 48 VDC black DC power wires from your power source Step 2 Remove the PM ground wires green and yellow from the PM ground stud Step 3 Loosen the screw and press the latch to release the PM from the chassis Pull the handle and gently slide the PM...

Страница 95: ...ng DC power to a CDE300 is two PM connects but it is recommended that you use all three PM connects Figure D 5 shows the rear view of a fully connected CDE300 and provides the location of the studs and PMs Figure D 5 CDE300 Rear Panel Connect DC power to the CDE300 by performing the following steps Caution Make sure the DC power wires are not attached to the DC power source until all the ground wi...

Страница 96: ...d barrels so that they fit on the Building PM ground stud see Figure D 6 Star washer Building ground ring lug Star washer Nut PM 1 ground ring lug PM 2 ground ring lug PM 3 ground ring lug Star washer Nut Figure D 6 CDE300 Building PM Ground Stud Order Note Install star washers between the ring lug and chassis ground connection so that the star washers dig into the metalwork finish and make a good...

Страница 97: ... to replace a PM you must first disconnect DC power and remove the PM from the CDE chassis Perform the following steps Step 1 Remove the Return red and 48 VDC black DC power wires from your power source Step 2 Remove the PM ground wires green and yellow from the Building PM ground stud Step 3 Press the butterfly lever to release the CDE from the chassis Pull the handle and gently slide the PM from...

Страница 98: ...following steps Caution Make sure the DC power wires are not attached to the DC power source until all the ground wires are connected on the CDE Step 1 Insert one blue DC power cable connector into the blue port on each PM making sure it is completely seated 1 PM 4 7 PM ground 2 PM 3 8 48 VDC 3 Building ground wire 9 PM ground stud 1 4 PM 2 10 Building ground stud 5 PM 1 11 PM ground stud 2 6 Retu...

Страница 99: ...gure D 8 Star washer PM 1 ground ring lug PM 2 ground ring lug Star washer Nut Note Install star washers between the ring lug and chassis ground connection so that the star washers dig into the metalwork finish and make a good ground bond Use a wrench to tighten the nut and secure the connection Figure D 8 CDE400 PM Ground Stud Order c Remove the nut and star washers from the PM 2 ground stud d Pl...

Страница 100: ...ch the Return red and 48 VDC black DC power wires to your power source The CDE400 is now ready for use Disconnecting Power and Replacing a PM on a CDE400 Warning The PM connectors and PMs are not hot swappable You must disconnect the power source from the building before disconnecting PM wires or removing PMs from a CDE Should you need to replace a PM you must first disconnect DC power and remove ...

Страница 101: ... power cable connector see Figure D 9 ships with the CDEs when you order the DC power option This is the only DC power connector you should use to connect power to the CDEs in your system Figure D 9 DC Power Cable and Pinouts 1 Return 4 PM ground wire and ring lug 2 48 VDC 5 48 VDC wire and ring lug 3 PM ground 6 Return wire and ring lug This illustration is in progress 280163 1 2 3 4 5 6 1 2 3 4 ...

Страница 102: ...D 12 Cisco Content Delivery Engine 100 200 300 400 Hardware Installation Guide OL 13478 03 Appendix D Connecting DC Power DC Power Cable Connector and Pinouts ...

Страница 103: ...rnet B 3 CDE 2 viii CDE100 1 3 CDE200 1 3 CDE300 1 3 CDE400 1 3 environmental specifications 2 2 initially configuring 4 1 4 14 intended uses 2 8 overview 1 1 preparing to install 2 1 registering with CDSM 4 15 safety 2 8 server types 3 1 site requirements 2 1 CDE100 BIOS Setup 4 3 connectors 1 11 3 6 control buttons 1 6 disk drives 3 9 hardware features 1 5 LEDs 1 8 overview 1 3 physical dimensio...

Страница 104: ... safety warnings 2 3 specifications A 3 CDS image CD 4 1 installing the software 4 1 4 13 Release 2 0 2 1 software 4 13 CDSM 2 viii 1 1 3 1 CDE100 1 2 CDE200 1 2 connections 3 8 registering CDEs 4 15 verifying 4 15 verifying devices 4 17 chipset Lindenhurst 3 1 Serverworks C 1 circuit breakers for DC power 2 9 Cisco Technical Assistance 5 2 Common Bonding Network CBN 2 9 configuration assigning a ...

Страница 105: ...placing CDE200 PM D 4 CDE300 PM D 7 CDE400 PM D 10 safety warnings 2 6 devices verifying with the CDSM 4 17 disk drives CDE100 3 9 CDE200 3 9 CDE300 3 9 CDE400 3 9 IDE compact flash 4 1 4 13 installing 3 9 removing 3 9 USB CD ROM 4 1 E electrostatic discharge ESD damage 2 1 2 7 EMC regulatory compliance 2 8 environment 3 5 environmental specifications 2 2 Ethernet adapter troubleshooting 5 1 Ether...

Страница 106: ...200 3 3 3 4 boot sequence 4 13 CDE300 3 3 3 4 CDE400 3 3 3 4 CDS Release 2 0 2 1 software 4 13 CDS Release 2 0 software 4 1 disk drives 3 9 environment 3 5 physical connections 3 5 preparing CDEs for rack 3 4 rack 3 5 rack safety guidelines 3 3 software installation order 4 2 tools and parts 3 2 Integrated Vault Streamer see ISV interfaces stream 4 2 Internet Streamer CDS overview 1 1 server types...

Страница 107: ...face 1 11 management interface 1 11 serial console interface 1 11 USB 4 1 VGA interface 1 11 power AC 2 8 connecting DC power D 1 cords 2 8 3 6 DC 2 9 power module see PM power supply AC 2 8 DC 2 9 ESD damage 2 1 R removing CDE200 PM D 4 CDE300 PM D 7 CDE400 PM D 10 disk drives 3 9 RJ 45 crossover pin assignments B 5 RJ 45 straight through pin assignments B 5 RS 232 connector pin assignments B 1 R...

Страница 108: ... A 1 C 1 SR 1 1 3 1 connections 3 8 streamer 1 2 3 1 CDE300 1 2 connections 3 8 stream interfaces 4 2 SX CDE300 3 7 T technical specifications see specifications temperature non operating 2 2 operating 2 2 2 10 terminal server parameters 4 1 troubleshooting Cisco Technical Assistance 5 2 Ethernet adapter 5 1 SATA drives 5 2 TV CDS OnDemand 1 2 overview 1 2 server types 3 1 Video Accelerator 1 2 U ...

Отзывы: