8-16
Cisco ASR 1000 Series Aggregation Services Routers Hardware Installation Guide
OL-13208-09
Chapter 8 Cisco ASR 1002 Router Overview and Installation
Rack-Mounting the Cisco ASR 1002 Router
Figure 8-10
Attaching the Cable-Management Brackets to the Cisco ASR 1002 Router
Step 6
Screw the cable-management bracket to each side of the rack-mount brackets already attached to the
chassis. Use two screws for each cable-management bracket. Use the package of four screws.
Step 7
Check that all screws are securely tightened.
Step 8
Go to the
“Attaching a Chassis Ground Connection” section on page 8-25
to continue the installation.
Rack-Mounting the Cisco ASR 1002 Router
The Cisco ASR 1002 Router can be installed in an existing rack with equipment or in an empty rack with
no equipment: The chassis can be mounted in either rack types:
•
Two-post rack, either 19 inch or 23 inch. Inner clearance (the width between the inner sides of the
two posts or rails) must be at least 19 inches (48.26 cm). The height of the chassis is 3.47 inches
(8.8 cm). Airflow through the chassis is from front to back.
Note
If you are using a two-post rack secure the rack to the floor surface to prevent tipping and
avoid bodily.
•
Four post, 19-inch equipment rack. Inner clearance (the width between the inner sides of the two
posts or rails) must be at least 19 inches (48.26 cm). The height of the chassis is 3.47 inches (8.8
cm). Airflow through the chassis is from front to back.
Note
When handling the chassis, always follow proper lifting practices. See the
“Chassis-Lifting Guidelines”
section on page 5-23
.
1
Cable-management bracket top and bottom
screw
3
Chassis front rack-mount bracket
2
Cable-management bracket
—
—
ASR 100
2
stat
pwr
min
maj
crit
SPA-4XOC
3-POS
S
T
A
T
U
S
0
1
2
3
C
/A
A
/L
C
/A
A/L
C
/A
A
/L
C
/A
A
/L
SPA-4XOC
3-POS
S
TA
TU
S
0
1
2
3
C
/A
A
/L
C
/A
A
/L
C/A
A/L
C/A
A
/L
STAT
QE0
QE1
QE2
QE3
BOOT
CARRIER
LINK
PWR ST
AT
MTS
MGMT
AUX
CON
SPA-4XOC
3-POS
S
T
A
T
U
S
0
1
2
3
C/A
A
/L
C
/A
A
/L
C
/A
A
/L
C
/A
A
/L
280280
1
1
3
2