C H A P T E R
2
Preparing for Installation
This chapter describe how to prepare for the installation of the router at your site.
•
•
Safety Warning Statements, page 20
•
Safety Guidelines for Personal Safety and Equipment Protection, page 20
•
Safety Precautions for Module Installation and Removal, page 21
•
Safety with Electricity, page 21
•
Power Supply Considerations, page 22
•
Preventing ESD Damage, page 22
•
•
•
Floor Loading Considerations, page 26
•
Site Power Guidelines, page 27
•
Electrical Circuit Requirements, page 27
•
Site Cabling Guidelines, page 27
•
Asynchronous Terminal Connections, page 28
•
Interference Considerations, page 28
•
Installation Checklist, page 31
•
•
Chassis-Lifting Guidelines, page 33
•
•
Unpacking and Verifying the Shipped Contents, page 34
Cisco ASR-920-12SZ-IM Aggregation Services Router Hardware Installation Guide
19