•
Ratcheting torque screwdriver with a Phillips head that exerts up to 30-pound force per square inch
(in-lb) or 0.02-kilograms force per square millimeter (kgf/mm2) of pressure
•
Crimping tool as specified by the ground lug manufacturer
•
Wire-stripping tools for stripping both 6-AWG and 12-AWG wires
•
Tape measure and level
Only trained and qualified personnel should be allowed to install or replace this equipment. Statement 49
Warning
Unpacking and Verifying the Shipped Contents
When you receive your chassis, perform the following steps:
SUMMARY STEPS
1.
Inspect the box for any shipping damage. If there is obvious physical damage, contact your Cisco service
representative.
2.
Unpack the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Router.
3.
Perform a visual inspection of the chassis.
4.
Use the table below to check the contents of the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M,
ASR-920-24TZ-M Router shipping container. Do not discard the shipping container. You will need the
container if you move or ship the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Router
in the future.
DETAILED STEPS
Step 1
Inspect the box for any shipping damage. If there is obvious physical damage, contact your Cisco service representative.
Step 2
Unpack the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Router.
Step 3
Perform a visual inspection of the chassis.
Step 4
Use the table below to check the contents of the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Router
shipping container. Do not discard the shipping container. You will need the container if you move or ship the Cisco
ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Router in the future.
Table 13: Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Router Default Shipping Container Contents
Description
Component
Cisco ASR 920 Series Router chassis
Fan tray (PID: ASR-920-FAN-TRAY). By default, the fan
tray is installed in the chassis.
Chassis (PID: ASR-920-12SZ-IM)
Cisco ASR-920-12SZ-IM Aggregation Services Router Hardware Installation Guide
34
Preparing for Installation
Unpacking and Verifying the Shipped Contents