
Installing
and
Configuring
Processor Modules
Before
proceeding
ensure
that
you
have
met
the following
prerequisites
You
have
the
proper
tools
and ESD-prevention
equipment
available
You have
two
or four
SIMMs
of an
approved
type
and
speed
that
you
obtained
from
an
approved
vendor
To upgrade
DRAM
you
install
SIMMs
in
one
or both
DRAM
SIMM
banks
Table
5-6
lists
the
various
configurations
of
DRAM
SIMMs
that
are available
to
you
This information
is
also available
on
ClO
Note which
banks
are
used
given
the combinations
of available
SIMM
sizes
and
the
maximum
DRAM
you
require
The
onboard
default
Flash
memory
is
MB
Table
5-6
DRAM
SIMM
Configurations
DRAM
Bank
Quantity
DRAM
Bank
Quantity
Total
DRAM
Product
Names
U33
and
U21
8-MB
SIMMs
U12
and
U4
16MB
MEM-RSP-16M
U33
and
U21
16-MB
SIMMs
U12
and
U4
32
MB
MEM-RSP-32M
U33
and
U21
32-MB
SIMMs
U12
and
U4
64
MB
MEM-RSP-64M
U33
and
U21
32-MB
SIMMs
Ul2
and
U4
32-MB
SIMMs
128
MB
MEM-RSP-128M
Caution
To
prevent
DRAM
errors each
DRAM
bank
must
contain
no
less
than
two
SIMMs
of the
same
type Also
you must
install
either
two
SIMMs
in
Bank
or four
SIMMs
in
both
banks
You
should
not
install
two
SIMMs
and
Bank
with
no
SIMMs
in
Bank
Bank
must
always
contain
two
SIMMs
Removing
SIMMs
Place
removed
SIMMs
on
an
antistatic
mat and
store
them
in
an
antistatic
bag
You can
use
the
SIMMs
that
you remove
in
compatible
equipment
To
prevent
ESD
damage
handle
SIMMs
by
the
card
edges
only
Follow
these
steps
to
remove
the existing
SIMMs
Step
Thm
OFF
the
system power
To
channel
ESD
voltages
to
ground
ground
the chassis
Step
Attach
an
ESD-preventive
wrist
strap
between
you
and
an
unpainted
chassis surface
Step
Disconnect
the console
and
auxiliary
cables
from
the
RSP2
Step
Referring
to
Figure
5-2 in the section
Removing
Interface
Processors
loosen
the captive
installation
screws
on
the
RSP2
and remove
it
from
the chassis
Step
Place
the
RSP2
on
an
antistatic
mat
or
pad
and
ensure
that
you
are
wearing
an
antistatic
device
such
as
wrist strap
Position
the
RSP2
so
that
the handle
is
away
from
you
and
the
edge
connector
is
toward
you
this
is
the opposite
of the position
shown
in
Figure
5-6
Step
Locate
SIMMs
The
DRAM
SIMMs
occupy
U21
and
U33
in
Bank
and
U12
and
U4
in
Bank
See
Figure
5-6
5-24
Cisco
7513
Hardware
Installation
and
Maintenance
Содержание 7513 Series
Страница 1: ......
Страница 11: ...Cisco 7513 Hardware Installation and Maintenance ...
Страница 121: ...Site Log 2 56 Cisco 7513 Hardware Installation and Maintenance ...
Страница 162: ...Troubleshooting the Processor Subsystem 4 10 Cisco 7513 Hardware Installation and Maintenance ...
Страница 266: ...Interface Processor LEDs B 16 Cisco 7513 Hardware Installation and Maintenance ...
Страница 270: ...C 4 Cisco 7513 Hardware Installation and Maintenance ...
Страница 288: ...18 Cisco 7513 Hardware Installation and Maintenance ...