
Maintaining the Cisco 12008 7-63
Removing and Replacing Switch Cards
Installing a CSC
To install a CSC in the router, perform the following steps.
Note
Before accessing any of the router’s internal components, put on an antistatic wrist
strap and make sure that it makes ample contact with your skin. Insert the equipment end
of the wrist strap (the banana jack) into the ESD socket in the lower left corner of the upper
card cage.
Step 1
With one hand, grasp the new CSC by its faceplate; support the weight of the
card by placing your free hand beneath the card carrier.
Step 2
Position the card vertically and insert it into the vacant slot in the upper card cage
until the card’s ejector levers meet the retention lips at the top and bottom of the
enclosure (see Figure 7-19).
Step 3
Pivot the ejector levers toward the card faceplate to engage the retention lips at
the top and bottom of the enclosure and firmly seat the card in the backplane (see
Figure 7-19).
This completes the procedure for removing and installing a CSC.
To verify that the new CSC is operating properly, perform the procedure in the following
section.
Содержание 12008
Страница 4: ......
Страница 12: ...Cisco 12008 Gigabit Switch Router Installation and Configuration Guide xii ...
Страница 22: ...Obtaining Technical Assistance Cisco 12008 Gigabit Switch Router Installation and Configuration Guide xxii ...
Страница 102: ...Agency Approvals Cisco 12008 Gigabit Switch Router Installation and Configuration Guide 1 80 ...
Страница 132: ...Using a Site Log Cisco 12008 Gigabit Switch Router Installation and Configuration Guide 2 30 ...