 2�- FORESEEABLE MISUSE

This type of canopy is not intended to:

  To  withstand  overloads  higher  than  those  indicated  in  the  corresponding  certificate  of 

technical characteristics, due to meteorological conditions (snow and wind) of the site and the 

own weight of the solar panels.

 People will not be allowed to climb onto the canopy, with the exception of those who access 

it to carry out maintenance and assembly tasks. No more than one person with their personal 

work material (100 kg) may climb onto the canopy.

 It is not allowed to cover the sides, front or rear with any type of enclosure that wholly or 

partially prevents the passage of the wind.

  The  installation  of  posters  or  jutting  elements  is  not  allowed,  nor  in  general,  any  added 

element that increases the surface exposed to the wind.

 Only the assembly of original parts and components supplied by 

CIRCUTOR 

is allowed.

 

CIRCUTOR

 will not be held liable for any unauthorised modification to the canopy, once the 

same has been put into service.

 If a wall is installed along the entire length of the canopy, a special study will be required to 

vary the coefficient of obstruction contemplated in the calculation.

 

Figure 1:

 Variation of the obstruction coefficient.

 If the canopy is installed in the vicinity of a height change or on a steep wall or mound that 

increases the height of the canopy above the ground level to more than 3 m in height at the 

centre point of the roofing, a special study will be required owing to the modification of the 

pressure and suction coefficients considered in the calculation.

7

Installation Guide

PV2

Содержание PV2 Series

Страница 1: ...INSTALLATION GUIDE M233A01 03 18A Canopies PV2...

Страница 2: ...2 PV2 Installation Guide...

Страница 3: ...the following should be taken into consideration Incorrect handling or installation of the unit may result in injury to personnel as well as damage to the unit In particular handling with voltages app...

Страница 4: ...7 4 INSTALLATION OF EARTHING POINT 26 8 PROFILES AND MODULES 27 8 1 PREPARATION OF PROFILES 27 8 2 FITTING OF CENTRAL PROFILES 28 8 3 FITTING OF SIDE PROFILES 29 8 4 FASTENING OF MODULES A 30 8 5 FAST...

Страница 5: ...able 1 Revision log Date Revision Description 11 18 M233A01 03 18A Initial version Note The images of the devices are for illustrative purposes only and may differ from the original device 5 Installat...

Страница 6: ...ms and conditions expressed below Exclusions and Limitations of Guarantees Those damages and faults established herein will be exempt from the warranty rights whenever these arise from 1 Accidents or...

Страница 7: ...is not allowed nor in general any added element that increases the surface exposed to the wind Only the assembly of original parts and components supplied by CIRCUTOR is allowed CIRCUTOR will not be h...

Страница 8: ...20 kWp 12 5 PV2 14 35 0 m 29 40 kWp 14 6 PV2 16 40 0 m 33 60 kWp 16 7 PV2 18 45 0 m 37 80 kWp 18 7 PV2 20 50 0 m 42 00 kWp 20 8 PV2 22 55 0 m 46 20 kWp 22 9 PV2 24 60 0 m 50 40 kWp 24 9 PV2 26 65 0 m...

Страница 9: ...4 COMPONENTS LD PPV10APLI TV10APLI VI A PI LI PC B VC LC PF C VF LI LD M Figure 3 PV2 Components 9 Installation Guide PV2...

Страница 10: ...00 WING ANGLE M233700000000 CENTRAL FOOT M26700000000 CENTRAL WING DIN 931 DIN 6923 DIN 934 DIN 9021 M20X130 M10 M24 Zn M24 M20 M24 27u 32u 24u 4u 26u 8u DIN 603 M10X25 M10X50 16u 16u M20 17u C 2u 4u...

Страница 11: ...6 120 24 36 8 144 56 24 432 72 72 PV2 18 135 24 42 6 168 66 24 504 84 84 PV2 20 150 28 46 8 184 72 28 552 92 92 PV2 22 165 32 50 10 200 78 32 600 100 100 PV2 24 180 32 56 8 224 88 32 672 112 112 PV2 2...

Страница 12: ...to recharging point in start foot AC wiring Figure 4 Standard installation with recharging point in start foot 5 1 2 STANDARD INSTALLATION WITH RECHARGE POINT IN START AND END FOOT Lowering of strings...

Страница 13: ...Power supply of recharging points in each foot AC wiring Figure 6 Major installation 5 1 4 INTERNAL CONNECTION OF FEET STRINGS CONDUCTION OF DC WIRING THROUGH THE BEAMS EARTH CONNECTION POINT PLEASE...

Страница 14: ...NGTH OF 6 M APPROXIMATELY FROM CASKET SPLICE FOR THE LOWERING OF STRINGS DC WIRING IF IT IS ONLY FOR AC WIRING OF THE CHARGER PROJECTION OF 4 M APPROXIMATELY OF CASKET SPLICE LEAVE CABLES IN PLACE CAS...

Страница 15: ...5 3 EARTH CONNECTION ON EACH FOOT CASKET FOOT TUBE Figure 9 Earth connection 5 4 ASSEMBLE TEMPLATES Torque kp m 71 M24 24x 50 50 500 950 Figure 10 Assembly of templates 15 Installation Guide PV2...

Страница 16: ...5 5 FILLING THE FOOTINGS Figure 11 Filling the footings 5 6 REMOVE UPPER TEMPLATE Figure 12 Remove upper template 16 PV2 Installation Guide...

Страница 17: ...6 ASSEMBLY OF FEET AND WINGS 6 1 FOOT INSTALLATION A Torque kp m 71 M24 D24 4x 4x PULL PIPES WHEN LIFTING DO NOT STEP ON TUBES OR PIPES Figure 13 Foot installation A 17 Installation Guide PV2...

Страница 18: ...6 2 FOOT INSTALLATION B Torque kp m 71 M24 D24 4x 4x Figure 14 Foot installation B 18 PV2 Installation Guide...

Страница 19: ...6 3 INSTALLATION OF FEET REINFORCEMENT 1x UPPER VIEW Figure 15 Installation of foot reinforcement 19 Installation Guide PV2...

Страница 20: ...6 4 INSTALLATION OF WINGS A Torque kp m 71 M20X130 M20 7x 14x 7x Figure 16 Installation of wings A D20 20 PV2 Installation Guide...

Страница 21: ...6 5 INSTALLATION OF WINGS B Torque kp m 71 M20X130 M20 7x 14x 7x Figure 17 Installation of wings B D20 21 Installation Guide PV2...

Страница 22: ...6 6 ALIGNMENT OF THE FEET X Y X Y X Y X Y Figure 18 Alignment of the feet 22 PV2 Installation Guide...

Страница 23: ...7 ASSEMBLY OF BEAMS 7 1 FITTING OF ANGLES 2x 2x 2x 2x 2x 2x Figure 19 Fitting of angles 23 Installation Guide PV2...

Страница 24: ...7 2 BEAM ANGLES Torque kp m 71 M20X130 M20 4x 4x Figure 20 Beam angles 24 PV2 Installation Guide...

Страница 25: ...7 3 FITTING OF BEAMS Torque kp m 3 8 M10X25 M10x50 M10 2x 4x 2x 7 5m SYMMETRICAL BEAMS 2A 2B A B 2B 2A Figure 21 Fitting of beams 25 Installation Guide PV2...

Страница 26: ...7 4 INSTALLATION OF EARTHING POINT Torque kp m 3 8 M10X25 M10 1x 1x INSIDE VIEW OF THE INSTALLATION FOOT Figure 22 Installation of earthing point 26 PV2 Installation Guide...

Страница 27: ...ND MODULES 8 1 PREPARATION OF PROFILES A Torque kp m 3 8 M10X25 M10 M14 4x 4x 4x Figure 23 Preparation of profiles A B Torque kp m 3 8 M8X10 M8 1x 1x Figure 24 Preparation of profiles B 27 Installatio...

Страница 28: ...8 2 FITTING OF CENTRAL PROFILES Torque kp m 3 8 Figure 25 Fitting of central profiles 28 PV2 Installation Guide...

Страница 29: ...8 3 FITTING OF SIDE PROFILES M109200000002 Figure 26 Fitting of side profiles 29 Installation Guide PV2...

Страница 30: ...8 4 FASTENING OF MODULES A M104200000006 M106200000001 POSITION OF CONNECTION BOX PLEASE REFER TO POINT 8 6 Figure 27 Fastening of modules A 30 PV2 Installation Guide...

Страница 31: ...8 5 FASTENING OF MODULES B GPV10APLI TPV10APLI POSITION OF CONNECTION BOX PLEASE REFER TO POINT 8 6 Figure 28 Fastening of modules B 31 Installation Guide PV2...

Страница 32: ...Distribute the modules according to their connection as per the following scheme 1 2 2 3 3 4 1 2 3 4 1 2 3 4 DC WIRING CHANNEL THROUGH THE BEAMS AND INSIDE OF THE FOOT Figure 29 Connection of strings...

Страница 33: ...9 FINAL FOUNDATIONS Concrete Hormig n Figure 30 Final foundations 33 Installation Guide PV2...

Страница 34: ...10 INSTALLATION OF THE CHARGER Figure 31 Installation of the charger 34 PV2 Installation Guide...

Страница 35: ...of the canopy s parts must be made with the supplied screws and nuts Any change of screws and nuts must be communicated and authorised by the manufacturer The tightening torques of the joints must be...

Страница 36: ...sultation with the specialist technician especially in the case of changes in use Should these be exceeded there would be depletion in the structure leading to deformations and breaks People will not...

Страница 37: ...guidelines must be adjusted and if necessary these must be changed periodically according to the conditions of service and the product s alteration over time 11 3 2 REVISION AND MAINTENANCE TASKS 11 3...

Страница 38: ...ws or any other cause a remediation of the point with rust will be carried out immediately and a product will be applied to provide sufficiently accredited protection in the affected area This periodi...

Страница 39: ...to device operation or malfunction please contact the CIRCUTOR SA Technical Support Service Technical Assistance Service Vial Sant Jordi s n 08232 Viladecavalls Barcelona Tel 902 449 459 Espa a 34 937...

Страница 40: ...CIRCUTOR SA Vial Sant Jordi s n 08232 Viladecavalls Barcelona Tel 34 93 745 29 00 Fax 34 93 745 29 14 www circutor es central circutor com...