If the canopy is installed in the vicinity of a height change, or on a steep wall or mound that
increases the height of the canopy above the grade to more than 3 m in height at the centre
point of the roofing, a special study will be required owing to the modification of the pressure
and suction coefficients considered in the calculation.
11.2 -
USE AND UPKEEP
Maintenance is essential for proper service of this canopy. This section details the work to be
performed by the owner or a subcontracted company to ensure continuity in the service of the
canopy.
11�2�1�- STRUCTURAL ELEMENTS MUST NOT BE MODIFIED
The structural elements that make up the structure: bases, feet, wings and beams must not be
modified from their original state without the intervention of a qualified technician.
11�2�2�- USAGE OVERLOAD INDICATED IN THE PROJECT MUST NOT BE EXCEEDED
The overload of use cannot be exceeded without prior consultation with the specialist technician,
especially in the case of changes in use. Should these be exceeded, there would be depletion
in the structure leading to deformations and breaks.
People will not be allowed to climb onto the canopy, with the exception of those who access it to
carry out maintenance and assembly tasks. No more than one person with their personal work
material (100 kg) may climb onto the canopy.
11�2�3�- THE ORIGINAL STATUS OF THE ELEMENTS OF THE CANOPY CANNOT BE MOD-
IFIED
Do not drill or weld in metal profiles without consulting a specialist technician.
The installation of posters or jutting elements is not allowed, nor in general, any added element
that increases the surface exposed to the wind.
11�2�4�- AVOID THE CONTACT OF THE STEEL WITH OXIDISING OR AGGRESSIVE ELE-
MENTS
Steel elements should not be exposed to aggressive elements such as urine and accumulations
of water in the areas of the feet are to be avoided.
Any abnormal situation that appears in the different structural elements must be notified
of to a trained technician or to the manufacturer�
36
PV2
Installation Guide
Содержание PV2 Series
Страница 1: ...INSTALLATION GUIDE M233A01 03 18A Canopies PV2...
Страница 2: ...2 PV2 Installation Guide...
Страница 18: ...6 2 FOOT INSTALLATION B Torque kp m 71 M24 D24 4x 4x Figure 14 Foot installation B 18 PV2 Installation Guide...
Страница 22: ...6 6 ALIGNMENT OF THE FEET X Y X Y X Y X Y Figure 18 Alignment of the feet 22 PV2 Installation Guide...
Страница 24: ...7 2 BEAM ANGLES Torque kp m 71 M20X130 M20 4x 4x Figure 20 Beam angles 24 PV2 Installation Guide...
Страница 28: ...8 2 FITTING OF CENTRAL PROFILES Torque kp m 3 8 Figure 25 Fitting of central profiles 28 PV2 Installation Guide...
Страница 29: ...8 3 FITTING OF SIDE PROFILES M109200000002 Figure 26 Fitting of side profiles 29 Installation Guide PV2...
Страница 33: ...9 FINAL FOUNDATIONS Concrete Hormig n Figure 30 Final foundations 33 Installation Guide PV2...
Страница 34: ...10 INSTALLATION OF THE CHARGER Figure 31 Installation of the charger 34 PV2 Installation Guide...