11.3 -
REVISION AND MAINTENANCE
11�3�1�- GENERAL CONDITIONS
The construction management or the engineering company that carry out the project will
define the periods and maintenance actions required for the housing or foundation. It is highly
recommended to carry out testing procedures on concrete footings or housings.
In each maintenance revision a form sheet must be completed with the following information
outlined below:
- Maintenance Company.
- Person who performs the tasks.
- Date of completion of the works.
- Visually reviewed points.
- Damages in the visually reviewed points.
- Points reviewed using gauge key.
- Points that have been retightened due to tension slipping.
- If protective paintwork has been added.
- Remarks.
Maintenance work must be carried out with sufficient trained personnel who are qualified to
complete these tasks.
The maintenance guidelines must be adjusted and, if necessary, these must be changed
periodically according to the conditions of service and the product’s alteration over time.
11�3�2�- REVISION AND MAINTENANCE TASKS
11�3�2�1�- Periodicity: every six months
Visual inspection of the entire canopy, looking for possible damage to the entire structure such
as bumps, fissures, deformations, breaks, or possible rust issues. The fastening hardware at
the angles between the flag and the belts are points in which special attention must be paid.
Any damage will be repaired immediately to avoid possible accidents or lack of service.
Table of minimum visual revisions:
Table 3: Visual revision chart�
Visual revision
Appearance
Deformation
Base anchor screws
Top layer
Welding base Joint
Screws in the joint of the base and the foot
Point P1
Screws in the joint of the foot and the wing
Screws in the joint of the flag and the angle
Angle
Screw in the joint of the angle and the belts
End contact point between belts and angle
Belts central point
37
Installation Guide
PV2
Содержание PV2 Series
Страница 1: ...INSTALLATION GUIDE M233A01 03 18A Canopies PV2...
Страница 2: ...2 PV2 Installation Guide...
Страница 18: ...6 2 FOOT INSTALLATION B Torque kp m 71 M24 D24 4x 4x Figure 14 Foot installation B 18 PV2 Installation Guide...
Страница 22: ...6 6 ALIGNMENT OF THE FEET X Y X Y X Y X Y Figure 18 Alignment of the feet 22 PV2 Installation Guide...
Страница 24: ...7 2 BEAM ANGLES Torque kp m 71 M20X130 M20 4x 4x Figure 20 Beam angles 24 PV2 Installation Guide...
Страница 28: ...8 2 FITTING OF CENTRAL PROFILES Torque kp m 3 8 Figure 25 Fitting of central profiles 28 PV2 Installation Guide...
Страница 29: ...8 3 FITTING OF SIDE PROFILES M109200000002 Figure 26 Fitting of side profiles 29 Installation Guide PV2...
Страница 33: ...9 FINAL FOUNDATIONS Concrete Hormig n Figure 30 Final foundations 33 Installation Guide PV2...
Страница 34: ...10 INSTALLATION OF THE CHARGER Figure 31 Installation of the charger 34 PV2 Installation Guide...