5�- PREPARATION OF THE INSTALLATION
5.1.- STUDY INTO THE ELECTRICAL PROJECT
5�1�1�- STANDARD INSTALLATION WITH RECHARGE POINT IN START FOOT
Lowering of strings (DC wiring) per start foot.
Power supply to recharging point in start
foot (AC wiring).
Figure 4: Standard installation with recharging point in start foot�
5�1�2�-STANDARD INSTALLATION WITH RECHARGE POINT IN START AND END FOOT
Lowering of strings (DC wiring) per start foot.
Power supply to recharging point in start and end foot (AC wiring).
Figure 5: Standard installation with recharging point in start and end foot�
12
PV2
Installation Guide
Содержание PV2 Series
Страница 1: ...INSTALLATION GUIDE M233A01 03 18A Canopies PV2...
Страница 2: ...2 PV2 Installation Guide...
Страница 18: ...6 2 FOOT INSTALLATION B Torque kp m 71 M24 D24 4x 4x Figure 14 Foot installation B 18 PV2 Installation Guide...
Страница 22: ...6 6 ALIGNMENT OF THE FEET X Y X Y X Y X Y Figure 18 Alignment of the feet 22 PV2 Installation Guide...
Страница 24: ...7 2 BEAM ANGLES Torque kp m 71 M20X130 M20 4x 4x Figure 20 Beam angles 24 PV2 Installation Guide...
Страница 28: ...8 2 FITTING OF CENTRAL PROFILES Torque kp m 3 8 Figure 25 Fitting of central profiles 28 PV2 Installation Guide...
Страница 29: ...8 3 FITTING OF SIDE PROFILES M109200000002 Figure 26 Fitting of side profiles 29 Installation Guide PV2...
Страница 33: ...9 FINAL FOUNDATIONS Concrete Hormig n Figure 30 Final foundations 33 Installation Guide PV2...
Страница 34: ...10 INSTALLATION OF THE CHARGER Figure 31 Installation of the charger 34 PV2 Installation Guide...