11�- USAGE AND MAINTENANCE
11.1 - INSTALLATION
Before the assembly of the canopies, the technical management of the works or the engineering
company that carries out the installation project must draft a technical project in which the
housings (foundations, footings, support structure, etc.) are sized accordingly with the resulting
stressed exerted on the canopy due to wind and snow indicated by the regulations applicable
to the specific location of the canopy.
11�1�1�- ASSEMBLY ACCORDING TO MANUFACTURER SPECIFICATIONS
The canopies must be assembled following the instructions in this assembly manual. Under no
circumstances may parts or pieces be modified, or steps omitted.
11�1�2�- DIFFICULTIES AND VARIATIONS DURING ASSEMBLY
Any damage detected during the assembly, either as a result of the actual process or if any part
does not match those described in the manual, must be notified of to the company supplying
the structure.
11�1�3�- BONDING OF PARTS AND TIGHTENING TORQUE
All joints of the canopy’s parts must be made with the supplied screws and nuts. Any change of
screws and nuts must be communicated and authorised by the manufacturer.
The tightening torques of the joints must be checked according to the following specifications:
M8
= between 16 and 19 Nm
M10
= between 33 and 39
M20
= between 182 and 274 Nm
M24
= between 264 and 324 Nm
11�1�4�- FOUNDATIONS, ALIGNMENT AND LEVELLING OF THE CANOPIES
The foundations must be made with the material supplied by the manufacturer and according
to the specifications described in this manual.
The legs must be aligned and level.
In the event that these requirements cannot be met due to the type of installation, please notify
the manufacturer to study the situation and behaviour of the canopy.
Any installation made on sloping terrain should be specifically studied to ensure the proper
functioning of the canopy.
11�1�5�- LOCATION AND CHARACTERISTICS OF THE INSTALLATION ZONE
The canopies have been studied to be installed free of any building or nearby walls. If an
adjacent wall is installed, a special study will be required to vary the coefficient of obstruction
contemplated in the calculation.
35
Installation Guide
PV2
Содержание PV2 Series
Страница 1: ...INSTALLATION GUIDE M233A01 03 18A Canopies PV2...
Страница 2: ...2 PV2 Installation Guide...
Страница 18: ...6 2 FOOT INSTALLATION B Torque kp m 71 M24 D24 4x 4x Figure 14 Foot installation B 18 PV2 Installation Guide...
Страница 22: ...6 6 ALIGNMENT OF THE FEET X Y X Y X Y X Y Figure 18 Alignment of the feet 22 PV2 Installation Guide...
Страница 24: ...7 2 BEAM ANGLES Torque kp m 71 M20X130 M20 4x 4x Figure 20 Beam angles 24 PV2 Installation Guide...
Страница 28: ...8 2 FITTING OF CENTRAL PROFILES Torque kp m 3 8 Figure 25 Fitting of central profiles 28 PV2 Installation Guide...
Страница 29: ...8 3 FITTING OF SIDE PROFILES M109200000002 Figure 26 Fitting of side profiles 29 Installation Guide PV2...
Страница 33: ...9 FINAL FOUNDATIONS Concrete Hormig n Figure 30 Final foundations 33 Installation Guide PV2...
Страница 34: ...10 INSTALLATION OF THE CHARGER Figure 31 Installation of the charger 34 PV2 Installation Guide...